25kV AC Traction Power Works for Perth City Link Rail Project
Public Transport Authority · Awarded contract
Awarded25kV AC Traction Power Works for Perth City Link Rail Project
Awarded 23 Feb 2011
Awarded23 Feb 2011
Value$380,837.00
SupplierDowner EDI Engineering Power Ltd (DOWNER EDI ENGINEERING POWER PTY LTD)ABN 53 000 983 700
StateWA
CategoryInfrastructure
Ended 14y 6mo ago1y 3mo term
Awarded 23 Feb 2011Expired 20 May 2012
About
The Public Transport Authority awarded a contract to Downer EDI Engineering Power Ltd for the Forward Works Package 7 of the Perth City Link Rail Project, involving removal of existing 25kV cables and installation of new cables in pits and conduits along the Perth Station forecourt.
Similar open tenders12
TenderCloses
Delivery of Electricity Transmission Projects in Central Queensland — PowerlinkEnergy & Environment
30 Jun 2028
Parramatta Light Rail Stage 2 Enabling Works — $322M Contract Awarded to John HollandTransport & Logistics
30 Apr 2027
Roma Street Connect Main Works Package – Station Lifts, Escalators and Accessibility UpgradesTransport & Logistics
30 Nov 2026
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
15 Dec 2026
Design, Construction and Commissioning of 1.96 km High-Voltage Line and Transformer for Bore 4, WilcanniaInfrastructure
16 Dec 2026
Replacement of Congdon Street Bridge over Rail at Swanbourne Train Station – Main Roads Western AustraliaInfrastructure
11 Dec 2026
HumeLink West — 365 km 500 kV Transmission Link Connecting Snowy 2.0 at Maragle to Wagga WaggaEnergy & Environment
30 Dec 2027
Electrical Infrastructure Upgrade at Blacktown Training Depot, NSWInfrastructure
10 Dec 2026
HVDC Converter Package – Marinus Link (Hitachi Energy Selected to Supply)Energy & Environment
30 Oct 2027
Systems Frameworks Package – Sydney Metro West 24 km Underground Metro (Parramatta to Sydney CBD)Transport & Logistics
13 Jul 2028
Marinus Link — Undersea and Underground Electricity and Data Interconnector between North West Tasmania and Latrobe Valley (Victoria)Energy & Environment
30 Jun 2028
Installation of EV Charger at Hadfield Depot – Merri-bek City CouncilEnergy & Environment
11 Dec 2026
Suppliers similar to Downer EDI Engineering Power Ltd (DOWNER EDI ENGINEERING POWER PTY LTD)8
SupplierContracts
DOWNER EDI ENGINEERING ELECTRICALPublic Services & Welfare
53
Downer EDI rail pty ltdTransport & Logistics
310
Downer EDI WorksInfrastructure
179
Downer EDIConstruction
703
DownerEDi EngineeringConstruction
22
Australian Railway Signalling and Electrical Pty LtdInfrastructure
11
Western PowerInfrastructure
61
DACE Design And Consulting Engineers (Cyberside Pty Ltd)Infrastructure
22
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






