Architectural Design of Premium Bus Stop Shelter at James Cook University Bus Station
Transport & Main Roads · Awarded contract
AwardedArchitectural Design of Premium Bus Stop Shelter at James Cook University Bus Station
Awarded Unknown
AwardedNot specified
Value$61,051.00
SupplierBARK DESIGN ARCHITECTS
AgencyTransport & Main Roads
StateQLD
CategoryInfrastructure
About
Transport & Main Roads awarded a contract to Bark Design Architects for the architectural design of a shelter for the JCU Bus Station premium bus stop at James Cook University, valued at AUD 61,051.
Source record4567
Similar open tenders12
TenderCloses
Design and Construction of James Cook Drive Pavement Replacement and Remediation (Stages 3 & 4) – James Cook UniversityInfrastructure
11 Nov 2026
Construction and Installation of Concrete Bus Shelters – City of AlbanyTransport & Logistics
25 Nov 2026
Gatehouse and Associated Civil Works at University Drive Waste Facility – Bundaberg Regional Council (TEN/2798)Construction
17 Nov 2026
Advertising-Funded Bus Shelter Program — Supply and MaintenanceTransport & Logistics
17 Nov 2026
Head Contractor for UniSC Moreton Bay Stage 3 — New Six‑Storey Building B1 and A1 Level 1 RefurbishmentConstruction
27 Nov 2026
Design and Construction of EV Bus Depot Stage 1 — ClaisebrookTransport & Logistics
27 Nov 2026
Integrated Master Plans for Sutherland Shire Depots, Animal Shelter and Recycling FacilityInfrastructure
23 Nov 2026
Design & Construct Accessibility, Functionality and Rear Extension — Dorothy Jones Library, TullyConstruction
25 Nov 2026
Design and Construction of Stormwater Drainage Upgrades – Baxter Road & Botany Lane, MascotWater & Sanitation
11 Dec 2026
Construction and Refurbishment of Building 9, School of Education — Edith Cowan University JoondalupConstruction
11 Dec 2026
Design and Construction of Covered Walkways and Ramps – Bli Bli State School, QLD (Ed4All)Construction
25 Nov 2026
Construction of Arrival Concourse at Mount Field National Park Visitor CentreConstruction
16 Nov 2026
Suppliers similar to BARK DESIGN ARCHITECTS8
SupplierContracts
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






