Commissioning of Solar System at AWD Facility by Locked In Solutions
Gladstone Area Water Board · Awarded contract
AwardedCommissioning of Solar System at AWD Facility by Locked In Solutions
Awarded 01 May 2026
Awarded01 May 2026
Value$23,493.00
SupplierLocked In Solutions Pty LtdABN 88664505542
StateQLD
CategoryEnergy & Environment
About
Gladstone Area Water Board awarded a contract to Locked In Solutions Pty Ltd for solar commissioning under contract CAP2023-449 AWD Solar commissioning, valued at AUD 23,493.
Source recordPU04006687 Lorna Crescent BEECHER QLD 4680
Similar open tenders12
TenderCloses
Lower Wonga 380MWdc Solar Farm and Large Battery Energy Storage System (BESS)Energy & Environment
30 Aug 2028
Electrical Works for Texas Wastewater Treatment Plant Upgrade – Goondiwindi Regional CouncilWater & Sanitation
10 Nov 2026
Design and Construction of Solar and Battery Energy Storage System at Bathurst Wastewater Treatment WorksEnergy & Environment
24 Nov 2026
Development of 400 MW / 1.8 GWh Battery Energy Storage System – Baranduda (adjacent to Wodonga Terminal Station)Energy & Environment
19 Oct 2027
Muswellbrook Solar Farm and BESS EPC – 135MWac and 100MWEnergy & Environment
31 Dec 2027
Latham Disconnected Microgrid Pilot — Design, Construction, Commissioning, Operation & MaintenanceEnergy & Environment
13 Nov 2026
Gregadoo Waste Management Centre – Replacement & Maintenance of Nine Extraction PumpsWater & Sanitation
20 Nov 2026
Supplementary Shipping Services for Australian Antarctic Division — Support for AIRP and Davis Infrastructure Works (Q2 2026-27 Tender)Transport & Logistics
16 Nov 2026
Project Delivery by Paradise Alliance — Sunwater with GHD and CPB Contractors/Georgiou GroupWater & Sanitation
30 Jun 2027
720MW Solar and Battery Project Construction near Uralla NSW – New England Solar (2000 ha)Energy & Environment
31 Dec 2026
Operations and Maintenance for Northern Territory Solar Farms – Department of Defence Market SoundingEnergy & Environment
20 Nov 2026
Goulburn River 585 MWp Solar Farm and Battery Energy Storage System (BESS) — Wollara Road, Upper HunterEnergy & Environment
31 Dec 2027
Other similar contracts12
Contract and supplierAwarded value
Solar Installation at Gladstone Area Water Board's AWD FacilityEnergy & EnvironmentDS Energy Services Pty Ltd
$3,815,041
Solar Installation at Gladstone Area Water Board's AWD FacilityEnergy & EnvironmentDS ENERGY SERVICES PTY LTD
$3,553,327
Engineering Services for AWD Solar Farm ProjectEnergy & EnvironmentJJ RYAN CONSULTING PTY LTD
$79,915
Maintenance and Repair Services Awarded to Locked In Solutions by Gladstone Area Water BoardConstructionLOCKED IN SOLUTIONS PTY LTD
$37,725
Electrical Design Services Awarded to Locked In Solutions by Gladstone Area Water BoardConsultancy & LegalLocked In Solutions Pty Ltd
$13,134
Provision of Engineering Services to Gladstone Area Water BoardConsultancy & LegalLocked In Solutions Pty Ltd
$42,583
Mechanical Engineering Project Awarded to Locked In Solutions Pty LtdManufacturing & IndustrialLocked In Solutions Pty Ltd
$47,652
Network Engineering Support Contract Awarded to Locked In SolutionsIT & SoftwareLOCKED IN SOLUTIONS PTY LTD
$53,922
Owner's Engineer Services for AWD Solar Project (Electrical)Energy & EnvironmentSafegroup Automation Pty Ltd TA Welcon Technologies
$94,130
Provision of Professional Engineering Services to Gladstone Area Water BoardConsultancy & LegalLocked In Solutions Pty Ltd
$15,048
Provision of Project Design Management Support to Gladstone Area Water BoardConsultancy & LegalLocked In Solutions Pty Ltd
$26,664
Switchboard Maintenance Contract Awarded to Locked In Solutions Pty LtdEnergy & EnvironmentLocked In Solutions Pty Ltd
$30,932
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






