Consultancy Services for Train Lengthening Program Scoping Study by Public Transport Authority
Public Transport Authority · Awarded contract
AwardedConsultancy Services for Train Lengthening Program Scoping Study by Public Transport Authority
Awarded 04 Sep 2019
Awarded04 Sep 2019
Value$38,610.00
SupplierGHD-Aurecon Joint Venture
StateWA
CategoryConsultancy & Legal
Ended 7y 1mo ago2mo term
Awarded 4 Sept 2019Expired 31 Oct 2019
About
Public Transport Authority awarded a contract to GHD-Aurecon Joint Venture for consultancy services to prepare a scope of work document detailing the requirements for upgrading the metropolitan passenger rail network signalling system to operate at 15 trains per hour.
The study covers the North-South line (Whitfords – Perth – Cockburn Central), East-West line (Claremont – Perth – Bayswater), and Armadale/Thornlie line (Perth – Beckenham Junction).
Similar open tenders12
TenderCloses
Replacement of Congdon Street Bridge over Rail at Swanbourne Train Station – Main Roads Western AustraliaInfrastructure
11 Dec 2026
Project Manager – Technical Planning for Sector 1 North (Department of Transport and Main Roads)Transport & Logistics
30 Nov 2026
Parramatta Light Rail Stage 2 Enabling Works — $322M Contract Awarded to John HollandTransport & Logistics
30 Apr 2027
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
01 Dec 2026
Detailed Design for Belconnen to City Transitway – Haydon Drive & Belconnen WayTransport & Logistics
10 Dec 2026
Melbourne Metropolitan Train Operations and Maintenance Franchise — Up to 15-Year ContractTransport & Logistics
04 Mar 2027
Beerburrum to Nambour Rail Upgrade Stage 1 – 15 km North Coast Line (John Holland Queensland & Seymour Whyte JV)Transport & Logistics
31 Dec 2026
Systems Frameworks Package – Sydney Metro West 24 km Underground Metro (Parramatta to Sydney CBD)Transport & Logistics
13 Jul 2028
Tunnelling Works Package C – Suburban Connect (Cheltenham to Glen W...)Transport & Logistics
22 Apr 2028
Sydney Metro 66 km Standalone Metro Railway and 31 Stations (2024)Transport & Logistics
31 Dec 2026
Suburban Connect Tunnelling Works Package C – Cheltenham to Glen W.Transport & Logistics
22 Apr 2028
Suburban Rail Loop — 90‑kilometre project to transform Victoria's public transportTransport & Logistics
31 Dec 2027
Suppliers similar to GHD-Aurecon Joint Venture8
SupplierContracts
GHDInfrastructure
142
Aurecon Perth (Aurecon (Australia) Pty Ltd)Infrastructure
55
GHD pty ltdConsultancy & Legal
4804
BG&E Pty LtdInfrastructure
160
G & G Engineering (Aust) Pty LtdInfrastructure
10
GHD2Research & Development
4
DACE Design And Consulting Engineers (Cyberside Pty Ltd)Infrastructure
22
Enviro Infrastructure Pty LtdInfrastructure
128
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






