Culvert Installation and Drainage Works on Murray Valley Highway by Goulburn-Murray Water
Awarded 15 Apr 2024
About
Goulburn-Murray Water awarded a contract to Apex Earthworks for the Murray Valley West DCD – OB32 and OB33 project.
The scope included removal of an existing 600mm x 300mm box culvert from Murray Valley Highway and installation of two rows of box culverts (1200mm wide x 450mm high x 20400mm long) perpendicular to the highway, aligning with upstream and downstream drains.
OB32 involved removal of a small pipe under a farm channel, installation of a new syphon, and remodeling of farm channel termination banks on private property.
Works included open trenching, culvert and headwall laying, pipe laying, road sealing, excavation, and obtaining necessary permits.