Detailed Design of Sewer Rising Main Replacement for North East Water
North East Water · Awarded contract
AwardedDetailed Design of Sewer Rising Main Replacement for North East Water
Awarded 19 Aug 2021
Awarded19 Aug 2021
Value$25,940.00
SupplierNorth East Survey Design Pty LtdABN 83 127 459 367
AgencyNorth East Water
StateVIC
CategoryWater & Sanitation
About
North East Water awarded a contract to North East Survey Design Pty Ltd for the detailed design of a sewer rising main replacement from Tawonga to Tawonga South.
The project involves designing a 100mm diameter, approximately 3400m long sewer main along the Kiewa Valley Highway, replacing an existing alignment that traverses private property.
Similar open tenders12
TenderCloses
Construction of Factory Road Sewage Rising Main – Gippsland WaterWater & Sanitation
18 Nov 2026
Construction of Church Street Rising Main (2012) – East Gippsland WaterWater & Sanitation
24 Nov 2026
Cannon Valley Network Reconfiguration – 450m 300 DN Water Main and Stormwater Works (Parker Road)Water & Sanitation
16 Nov 2026
Whyanbeel Water Main Replacement — Design and Construction on Karnak Road and Whyanbeel RoadWater & Sanitation
02 Dec 2026
Vickers Rd Pump Station C6B Diversion – Stage 1 Rising Main Construction (Townsville City Council)Water & Sanitation
23 Nov 2026
Design and Construction of Butler Bay Sewage Rising Main Replacement – Palm IslandWater & Sanitation
04 Dec 2026
Culvert Replacement and Repair Works – Kellys Road, Omeo ValleyInfrastructure
02 Dec 2026
Water Sensitive Urban Design Rectification — Gateway, Broadmeadows & Sassafras Sunbury (Hume City Council)Water & Sanitation
03 Dec 2026
Installation and Commissioning of 16 Recycled Water Connections – City of Onkaparinga (Aldinga Beach & Morphett Vale)Water & Sanitation
17 Nov 2026
Mount Isa City Council Water Main Works – HDD Crossings, Duchess Road Extension and Northridge Road DN150 ReplacementWater & Sanitation
30 Nov 2026
Gravity Sewer Trunk Main Upgrade – Miriam Drive to WWTP, Orange (Tender F4534)Water & Sanitation
16 Nov 2026
Construction of Southern and Northern Tunnels — North‑South Corridor (River Torrens to Darlington)Infrastructure
01 Jan 2028
Suppliers similar to North East Survey Design Pty Ltd8
SupplierContracts
Confluence GroupConsultancy & Legal
2
GMR Engineering Services Pty LtdConsultancy & Legal
6
Foresight Engineering ServicesWater & Sanitation
7
Chris Smith & AssociatesConsultancy & Legal
5
Rural Works Pty LtdConsultancy & Legal
3
PT Tomkinson & Associates Pty LtdConsultancy & Legal
10
Longford CivilWater & Sanitation
11
Architecture Matters Pty LtdConsultancy & Legal
5
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open water and sanitation tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






