HV Cable Installation from Longreach Kiosk to Geordie Bay for Rottnest Island Authority
Rottnest Island Authority · Awarded contract
AwardedHV Cable Installation from Longreach Kiosk to Geordie Bay for Rottnest Island Authority
Awarded 05 Aug 2025
Awarded05 Aug 2025
Value$289,507.00
SupplierBenang (Benang Energy Infrastructure Pty Ltd)ABN 94 630 194 384
StateWA
CategoryInfrastructure
Ended 1y 2mo ago2mo term
Awarded 5 Aug 2025Expired 30 Sept 2025
About
Rottnest Island Authority awarded a contract to Benang (Benang Energy Infrastructure Pty Ltd) for the supply and installation of a conduit link and a 240mmSQ High-Voltage (HV) cable.
The project extended from the new Longreach Kiosk to the new Geordie Bay HV/LV kiosk.
Similar open tenders12
TenderCloses
Engineering, Manufacture and Installation of High-Voltage Power Cable from Barrow Island to Normally Unattended Installation (NUI)Infrastructure
31 Dec 2026
Design, Procurement & Construction of 330kV Grid Connection — Parron Maam Marang Wind Farm, Badgingarra WAEnergy & Environment
17 Jul 2027
HVDC Converter Package – Marinus Link (Hitachi Energy Selected to Supply)Energy & Environment
30 Oct 2027
Utility Relocation for Terry Tongarra Left Slip Lane — Water, Sewer, HV/LV, Street LightingInfrastructure
25 Nov 2026
Wastewater Treatment Plant Capacity Expansion – Rottnest Island AuthorityWater & Sanitation
19 Nov 2026
Marinus Link — Undersea and Underground Electricity and Data Interconnector between North West Tasmania and Latrobe Valley (Victoria)Energy & Environment
30 Jun 2028
Utility Design Adjustment Services — Golden Highway Denman to Sandy Hollow Safety Upgrades & Central West Orana REZ Pullover BaysInfrastructure
16 Nov 2026
Design and Construct Russell Island Public Amenities, On-site Sewage Treatment and Community Space – 22 High StreetWater & Sanitation
07 Dec 2026
HumeLink East Transmission Reinforcement — Bannaby to WondalgaEnergy & Environment
30 Dec 2027
HumeLink West — 365 km 500 kV Transmission Link Connecting Snowy 2.0 at Maragle to Wagga WaggaEnergy & Environment
30 Dec 2027
Energy Queensland (Ergon Energy) Decarbonisation Infrastructure Upgrades — Horn and Thursday Island & Northern Peninsula AreaEnergy & Environment
13 Dec 2026
Calvale to Calliope River 87km Double-Circuit 275kV Transmission Line – Central QueenslandInfrastructure
22 Sep 2028
Suppliers similar to Benang (Benang Energy Infrastructure Pty Ltd)8
SupplierContracts
Hender Lee Electrical Contractors Pty LtdInfrastructure
23
Benash Nominees Pty Ltd as The Trustee for Benash Unit TrustInfrastructure
7
MOLLOY ELECTRICALInfrastructure
29
BENASH MAINTENANCE SERVICES PTY LTDConstruction
46
MG Electrical Services Pty LtdInfrastructure
36
Rise Electrics PTY LTDInfrastructure
6
KIER Contracting (Kier Contracting Pty Ltd)Infrastructure
2
TasNetworksInfrastructure
18
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far