Replacement of Floating Walkway Module MK21 at Mackay Boat Harbour
Transport and Main Roads · Awarded contract
AwardedReplacement of Floating Walkway Module MK21 at Mackay Boat Harbour
Awarded 10 Nov 2020
About
Transport and Main Roads awarded a contract to The Marina Specialist t/a The Jetty Specialist for the replacement of floating walkway module MK21 at Mackay Boat Harbour boat ramp, Mulherin Drive, Mackay.
The contract value is AUD 484,650, procured through a limited procurement method.
Source record44169-15823374551
Similar open tenders12
TenderCloses
Design and Construction of Barrack Street Jetty One Replacement — Department of Transport and Major InfrastructureInfrastructure
10 Nov 2026
Tuncurry Boat Maintenance Facility Redevelopment with 75-tonne Travel LiftConstruction
07 Dec 2026
Eastern Foreshore Boardwalk ReplacementInfrastructure
01 Dec 2026
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
01 Dec 2026
Riverboat Dock to Vic Park Levee Walkway – Campaspe Shire CouncilInfrastructure
17 Nov 2026
Pilot Vessel Launch Services for Port of Mackay and Hay PointTransport & Logistics
13 Nov 2026
Cairns Marine Precinct Common User Facility — Co‑Investment for Marine Maintenance InfrastructureTransport & Logistics
18 Dec 2026
Weir Tower Access Walkway Replacement – Charters Towers Regional CouncilConstruction
24 Nov 2026
Refurbishment and System Upgrades at HMAS Kuttabul & HMAS Waterhen, NSWConstruction
23 Nov 2026
Water Main and Sewer Construction for Walker Street & Bruce Highway Intersection Upgrade — MaryboroughWater & Sanitation
13 Nov 2026
Station Pier Marine Infrastructure Maintenance and Pile Rehabilitation – Ports VictoriaInfrastructure
11 Dec 2026
Mowbray Park Upgrade – Heritage Riverfront Park Facilities, East BrisbaneConstruction
25 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Replacement of Floating Walkway Module MK21 at Mackay Boat HarbourInfrastructureThe Marina Specialist t/a The Jetty Specialist
$10,758
Repair of Golden Beach Floating Walkway ModulesInfrastructureThe Marina Specialist t/a The Jetty Specialist
$78,860.3
Repair of Beachmere Floating Walkway by Marine StructuresInfrastructureThe Marina Specialist Pty Ltd trading as Marine Structures
$29,700
Repair of Floating Walkway at Mooloolaba Boat HarbourInfrastructureCoastal Marine Maintenance
$11,440
Repairs to the Maaroom Floating WalkwayInfrastructureThe Jetty Specialist
$43,371
Repair of Floating Walkway at Packers CampInfrastructureThe Marina Specialist Pty Ltd t/a Marine Structures
$60,687
Replacement of Floating Walkway Hinges at Mourilyan HarbourInfrastructureTailored Marine Group Pty ltd t/as Tailored Marine Solutions
$17,285
Restoration of Riedel Road Boat Ramp Floating Walkway After 2022 Flood DamageInfrastructureThe Marina Specialist Pty Ltd t/a The Jetty Specialist
$617,680
Maintenance of Floating Walkway at Mourilyan HarbourInfrastructureTAMS Group
$10,725
Inspection and Maintenance of Dungeness Boat Ramp Floating WalkwaysInfrastructureThe Marina Specialist Pty Ltd Trading as Marine Structures
$124,776
Repair of Concrete Floatation Module on Townsville Recreational Boating Park Floating WalkwayInfrastructureCivilPlus Constructions Pty Ltd
$13,662
Upgrade of Harold Walker (Junner St) Jetty in DunwichInfrastructureThe Marina Specialists Pty Ltd T/A The Jetty Specialists
$2,439,194
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






