Replacement of Jordan River Rail Bridge on Southern Line S27.70 (Design and Construct)
Department of Infrastructure, Energy and Resources · Awarded contract
AwardedReplacement of Jordan River Rail Bridge on Southern Line S27.70 (Design and Construct)
Awarded Unknown
AwardedNot specified
Value$1,092,549.00
SupplierVan Ek Contracting P/LABN 42 067 541 879
StateTAS
CategoryInfrastructure
About
Department of Infrastructure, Energy and Resources awarded a contract to Van Ek Contracting P/L for the design and construction replacement of the existing Jordan River Rail Bridge at Brighton on a new alignment as part of the Southern Line S27.70 project.
The contract covered the replacement of the existing rail bridge and delivery of works on a revised alignment.
Similar open tenders12
TenderCloses
Replacement of Congdon Street Bridge over Rail at Swanbourne Train Station – Main Roads Western AustraliaInfrastructure
11 Dec 2026
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
01 Dec 2026
Richmond Road M7 Upgrade – Transport for NSWInfrastructure
30 Jun 2027
West Moreton Bridge Renewal Stage 2 — Replacement of Four Timber Rail Bridges on Rosewood–Toowoomba LineInfrastructure
04 Dec 2026
Replacement of Bight Bridge over the Manning River, Wingham NSW – MidCoast CouncilInfrastructure
22 Jan 2027
Beerburrum to Nambour Rail Upgrade Stage 1 – 15 km North Coast Line (John Holland Queensland & Seymour Whyte JV)Transport & Logistics
31 Dec 2026
Parramatta Light Rail Stage 2 Enabling Works — $322M Contract Awarded to John HollandTransport & Logistics
30 Apr 2027
Moe Rail Crossing Upgrade and Associated RoadworksTransport & Logistics
18 Nov 2026
Construction of Southern and Northern Tunnels — North‑South Corridor (River Torrens to Darlington)Infrastructure
01 Jan 2028
Prince Edward Park Woronora Pedestrian Bridge Renewal – Design & ConstructInfrastructure
11 Dec 2026
Construction of 122m 5‑Span Concrete Bridge over Grawin Creek, 8.8 km East of CollarenebriInfrastructure
09 Dec 2026
Engineered Scaffolding and Temporary Access System for Fitzroy River Bridge – Central QueenslandInfrastructure
20 Nov 2026
Suppliers similar to Van Ek Contracting P/L8
SupplierContracts
VEC Civil Engineering Pty LtdInfrastructure
78
Shaw Contracting (Aust) Pty LtdInfrastructure
71
Works InfrastructureInfrastructure
25
ERTECH PTY LTDInfrastructure
51
Tas Span Pty LtdInfrastructure
28
Venarchie Contracting Pty LtdInfrastructure
27
Andrew Walter ConstructionsInfrastructure
52
Spectran Civil Pty LtdInfrastructure
15
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






