Supply of Long Lead Spares Valves for Engine Room Ship Side by ASP Ship Management to Department of Defence
Department of Defence · Awarded contract
AwardedSupply of Long Lead Spares Valves for Engine Room Ship Side by ASP Ship Management to Department of Defence
Awarded 02 Feb 2009
Awarded02 Feb 2009
Value$23,589.72
SupplierASP SHIP MANAGEMENT PTY LTD SIRIUSABN 81 080 401 949
AgencyDepartment of Defence
StateVIC
CategoryDefense & Aerospace
Ended 17y 7mo ago3mo term
Awarded 2 Feb 2009Expired 1 May 2009
About
Department of Defence awarded a contract to ASP SHIP MANAGEMENT PTY LTD SIRIUS for the supply of long lead spares valves for engine room ship side, utilizing an existing ASP contract.
Similar open tenders12
TenderCloses
ASC Supplier Capability & Innovation Portal — Australian Submarine Supply Chain PartnersDefense & Aerospace
30 Jan 2028
Like-for-Like Replacement of Dive Pool Sparger Air Compressors at MSACManufacturing & Industrial
19 Nov 2026
Replacement of End-of-Life Stormwater Pumps and System Upgrade at MSAC – Supply and Install Two New PumpsWater & Sanitation
09 Dec 2026
Very Short Range Air and Surface Defence System for Royal Australian Navy VesselsDefense & Aerospace
27 Nov 2026
Supply of Australian Border Force Ship's Boats – Deed of Standing OfferPublic Safety & Security
01 Dec 2026
Alice Springs Hospital – Plumbing and Hydraulic Maintenance & Minor Works (36-Month Contract)Construction
01 Dec 2026
Delivery of State-of-the-Art Submarine Building Facility — Osborne Naval ShipyardDefense & Aerospace
30 Dec 2028
Berth 2 Container Crane Remediation – Southern Ports Authority (Crane Maintenance & Repair)Transport & Logistics
17 Dec 2026
Space Machines Company — Development of Australian Suppliers of Parts and EquipmentManufacturing & Industrial
30 Jun 2030
Repairs and Maintenance of Fire Detection Systems in NT Government Assets — Darwin & East Arnhem (36-month contract)Public Safety & Security
03 Dec 2026
Berth 1 Land-Based Bollard Upgrade (PoE) – Southern Ports AuthorityInfrastructure
04 Dec 2026
Refurbishment and System Upgrades at HMAS Kuttabul & HMAS Waterhen, NSWConstruction
23 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Supply of Long Lead Spares Valves for Ballast Tanks to Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$50,500.07
Supply of Valves to Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$23,132.75
Supply of Valves to the Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$18,170.17
Supply of Valve Spare Parts to the Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$20,677.58
Supply of Ship Side Valves to the Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$88,656.41
Supply of Spares Valves and Hydraulic Remote Control System to Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$21,711.36
Long Lead Spares for New Pump via ASP ContractDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$11,217.36
Supply of Engine Spares to the Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$35,780.21
Supply of Long Lead Spares for Sea Water Pump to Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$18,985.7
Supply of High Pressure Valves to the Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$23,555.07
Replacement of Deck Steam System Valves by ASP Ship Management for Department of DefenceDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$92,312.99
Long Lead Spares for Sludge Management System via ASP ContractDefense & AerospaceASP SHIP MANAGEMENT PTY LTD SIRIUS
$11,532.54
Suppliers similar to ASP SHIP MANAGEMENT PTY LTD SIRIUS8
SupplierContracts
ASCDefense & Aerospace
791
Naval Ship ManagementDefense & Aerospace
367
A & P GROUP LTDDefense & Aerospace
462
Marine Plant SystemsDefense & Aerospace
86
AUSTRALIAN MARITIME SYSTEMS LTDDefense & Aerospace
143
AUSTAL SHIPS P/LDefense & Aerospace
238
NORSHIP MARINEDefense & Aerospace
160
A&D InternationalDefense & Aerospace
595
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open defense and aerospace tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






