Tender: Cataby Power Station – Fast-start Gas-Fired Plant (Up to 400 MW) for WA's South West Interconnected Syste...
Released 3 months ago
Closes30 Jul 2027
Likely valueRough estimate$200.0M to $1.8BInflation adjusted
LocationCataby, WA
AgencyALINTA ENERGY
SourceICN Gateway
CategoryEnergy & Environment
257 days leftCloses Fri, 30 July 2027
About
Alinta Energy is proposing the Cataby Power Station, a fast-start gas-fired power station designed to deliver up to 400 MW of reliable, on-demand electricity to WA's South West Interconnected Syste...
1 potential contact foundLocked
Auto-detected from the tender listing & documents. Verify before relying on them.
Similar open tenders3
TenderCloses
Design and Construct Contract for Kwinana Gas Power Generation 2 (220 MW open-cycle) — Clough for AGL EnergyEnergy & Environment
09 Jun 2027
Long-Term Reliability and System Strength Services for North Country (10–25 Year Contract) — Western PowerEnergy & Environment
01 Feb 2027
Narrabri Gas Project — Development and Production of Natural Gas (up to 850 Wells)Mining & Natural Resources
30 Dec 2030
Agency spend history
ALINTA ENERGYYearlyQuarterly
0
Contract size
Under $100K
$100K to $1M
$1M to $10M
$10M to $100M
$100M and over
What ALINTA ENERGY has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






