Tender: Construction of Culverts and Earthen Banks at 16 Murray River Wetlands – Mallee CMA RFMF
Released 9 months ago
About
Mallee CMA is seeking contractors to construct permanent small-scale culverts and earthen banks at 16 high-priority wetlands along the Victorian side of the Murray River, from Boundary Bend in the east to near the South Australian border in the west, to enable future watering. The works will replace temporary levee banks previously used and will enable future delivery of water using temporary pumps from the Murray River; infrastructure will be installed at strategically identified locations to avoid and minimise harm, such as existing access tracks and already disturbed areas. Mallee CMA is arranging the necessary environmental, planning, and cultural heritage approvals. The RFMF program is approved under the Sustainable Diversion Limit Adjustment Mechanism (SDLAM) and the funding agreement requires half of the sites to be built by the end of July 2026 and all works complete by December 2026. Works are divided into seven geographic packages and tenderers may bid for one or multiple packages.
Similar open tenders12
Similar awarded contracts12
Typical $280K to $2.7MAgency spend history
Mallee Catchment Management AuthorityContract size
What Mallee Catchment Management Authority has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






