Tender: Design and Construction of 45 ML Winter Storage at Dimboola Wastewater Treatment Plant
Released about 11 hours ago
About
Grampians Wimmera Mallee Water Corporation is seeking a supplier for the design and construction of a 45 ML winter storage facility at the Dimboola wastewater treatment plant. The tender covers delivery of a 45 megalitre winter storage asset through both design and construction work at the Dimboola WWTP.
Tender breakdown
From 10 documentsCompulsory site visit attendance is mandatory and you must contact Project Officer before the inspection day to register and get meeting location details
You must submit a compliant Local Industry Development Plan (LIDP) via the ICN VMC and include acknowledgement in the bid — tender cannot be evaluated without it; minimum local content 80% unless you can prove maximum achievable is less
Many lump sum quantities/line items are included and differences in actual quantities for lump sum items give no entitlement to claim — price carefully and include all obligations
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents10
Grouped by what each file is for
Similar open tenders12
Similar awarded contracts12
Likely value $3.0M to $26.0MAgency spend history
Grampians Wimmera Mallee Water CorporationContract size
What Grampians Wimmera Mallee Water Corporation has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






