Tender: Helen Street Footbridge Replacement – Design, Fabrication & Construction (Byron Shire Council)
Released about 5 hours ago
About
Byron Shire Council is seeking a contractor to deliver a complete design-and-construct solution to replace the Helen Street Footbridge superstructure, including investigation and detailed design, demolition of existing timber components, fabrication and installation of a new FRP deck and hot-dip galvanised steel balustrade system, temporary works, environmental management, certification, commissioning and project handover. Works must be delivered in accordance with relevant Australian Standards, including AS 5100, and provide a minimum 100-year design life suitable for the coastal environment. Closing date: 22 Dec 2026 05:00 PM (AEST). Reference: VP532935.
Tender breakdown
From 7 documentsWork is inside Cape Byron Marine Park and adjacent environmentally sensitive waterways — strict environmental controls, EMP and containment measures required
Design must be certified by a Chartered Civil Structural Engineer (CPEng) and include signed Certification Statement (Attachment 5)
Must provide two priced construction methodology options (full closure and staged) and include anticipated closure durations and critical path
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents7
Grouped by what each file is for
Similar open tenders12
Similar awarded contracts12
Likely value $60K to $180KAgency spend history
Byron Shire CouncilContract size
What Byron Shire Council has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






