Tender: Recoating and Refurbishment of Lake Eildon Tower Bulkheads – Goulburn Murray Water
Released about 1 year ago
About
Goulburn Murray Water is seeking a suitably qualified contractor to undertake minor refurbishment and recoating of the Lake Eildon Tower bulkheads to provide future protection and prolong their usable life. The scope requires replacing the existing protective coating on all 10 bulkheads, replacing the rubber P-seals on each bulkhead, and examining the cleaned bulkhead steel after blast cleaning with any necessary steel repairs completed prior to recoating. The existing coating is a coal tar derivative and will require full containment during the blast cleaning phase to capture respirable dust and aerosols, and the successful tenderer must submit a proposal for full containment and decontamination before applying a modern protective coating system. The contractor must comply with all relevant GMW and industry OHS procedures and statutory licensing/registration requirements, will be engaged as Principal Contractor on a DTF Minor Works Contract that requires securities during the works and the Defects Liability Period, and will have sole responsibility for the area on GMW land if works are undertaken onsite or sole responsibility and liability for the bulkheads during transit if works are completed offsite.
Similar open tenders12
Agency spend history
Goulburn-Murray WaterContract size
What Goulburn-Murray Water has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






