Temora Shire Council
Closed

Tender: Supply and Installation of Solar PV and Battery Storage at Temora Recreation Centre and Sewage Treatment Plant

Released 8 months ago

Closed22 Apr 2026Updated
LocationTemora, NSW
AgencyTemora Shire Council
SourceTemora Shire Council
CategoryEnergy & Environment
Submissions closedClosed Wed, 22 Apr 2026

Temora Shire Council is seeking a supplier for the supply and installation of solar photovoltaic (PV) and Battery Energy Storage Systems (BESS) at two operational Council facilities in Temora, NSW (2666). The project includes a 49.5 kW solar system with an 80 kWh battery at Temora Recreation Centre and a 39.9 kW solar system with a 78 kWh battery at the Temora Sewage Treatment Plant, with a key requirement that both systems operate as part of a Virtual Power Plant (VPP). These installations form part of Council’s commitment to reducing energy costs and improving energy resilience across its infrastructure portfolio; the Council is aiming for the systems to be operational. Closing Date: 20/Apr/2026 04:00 PM (UTC+10:00) Canberra, Melbourne, Sydney time. Reference number: VP503387.

This could be ideal for solar and battery installers experienced in commercial-scale PV and BESS projects and in VPP integration; key considerations include ensuring VPP-compatible operation, coordinating installation at two live operational sites, and meeting the regional project timing and tender closing deadline.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month