Airconditioning Upgrade for Public Transport Authority by Bassett Consulting Engineers
(inactive) Department of Treasury and Finance - Public Works · Awarded contract
AwardedAirconditioning Upgrade for Public Transport Authority by Bassett Consulting Engineers
Awarded 05 Jun 2009
Awarded05 Jun 2009
Value$46,712.00
SupplierBassett Consulting Engineers (WE Bassett & Partners Pty Ltd)ABN 22 004 873 634
StateWA
CategoryInfrastructure
About
(inactive) Department of Treasury and Finance - Public Works awarded a contract to Bassett Consulting Engineers (WE Bassett & Partners Pty Ltd) for engineering consultancy services related to the airconditioning upgrade at Level 2 of the Public Transport Centre in Perth.
Similar open tenders12
TenderCloses
Technical Advisor Services for Aerotropolis Bus Depot – Transport for NSWTransport & Logistics
19 Nov 2026
Bindoon Primary School Airconditioning Upgrade and Associated Building Works – Department of EducationConstruction
18 Nov 2026
Mukinbudin District High School Air Conditioning Upgrade and Associated Works – Department of EducationConstruction
25 Nov 2026
Design & Construct Replacement HVAC and Ventilation System for Onslow Airport Passenger Terminal – Shire of AshburtonConstruction
11 Dec 2026
Design and Construction of Vertical Transport Asset Replacement — Stage 1 (Public Transport Authority)Transport & Logistics
05 Jan 2027
Replacement of Fan Coil and Water‑Cooled Packaged Air Conditioning Units – Bankstown Civic Tower, NSWConstruction
07 Dec 2026
Service Upgrades to Onslow Multipurpose Courts and Childcare – Mechanical, Hydraulic & Electrical Works, Onslow WAConstruction
26 Nov 2026
Air Conditioner Servicing, RCD Testing and Cold‑Room Maintenance — Banana Shire CouncilConstruction
20 Nov 2026
Riverton Primary School – New Administration Block and Air Conditioning Upgrade (Level 3 Builder Pre-Qualification)Construction
10 Dec 2026
Supply and Installation of Chiller Plant, Cooling Tower and Main Switchboard Upgrade – Caloundra Indoor StadiumConstruction
19 Nov 2026
Repairs and Maintenance of Airconditioning Plant and Equipment — Darwin & Palmerston (36-Month Contract)Infrastructure
18 Nov 2026
Provision of Albany Regional Town Bus Service — Public Transport AuthorityTransport & Logistics
17 Dec 2026
Suppliers similar to Bassett Consulting Engineers (WE Bassett & Partners Pty Ltd)8
SupplierContracts
Northrop Consulting EngineersConsultancy & Legal
117
BENNETT DESIGN PTY LTDConstruction
49
Bassett Building Pty LtdConstruction
9
UnknownInfrastructure
3
Maunsell Australia Pty LtdInfrastructure
141
Engineering Technology Consultants (Engineering Technology Consultants Trust)Consultancy & Legal
19
Parsons BrinckerhoffConsultancy & Legal
472
BuiltConstruction
222
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far