Construction of Darebin Creek Trail Stages 4-8 Shared Path from Childs Road to Findon Road
Whittlesea City Council · Awarded contract
AwardedConstruction of Darebin Creek Trail Stages 4-8 Shared Path from Childs Road to Findon Road
Awarded 05 Sep 2016
Awarded05 Sep 2016
Value$0.00
SupplierConbi ContractorsABN 39 742 679 809
AgencyWhittlesea City Council
StateVIC
CategoryInfrastructure
About
Whittlesea City Council awarded a contract to Conbi Contractors for the construction of a 2.5 m wide shared path along Darebin Creek in Mill Park, spanning Stages 4-8 from Childs Road to Findon Road.
The works include demolition, site preparation, earthworks, concrete works, signs, line marking, top soiling and seeding, and associated works.
Only contractors holding Integrated Management System (Safety, Quality and Environmental) third-party accreditation to AS/NZS 4801 / ISO9001 / ISO 14001 or equivalent at tender closing were considered.
Similar open tenders12
TenderCloses
Construction of Yan Yean Pipe Track Shared Path – Bridge Inn Road to Hazel Glen Drive, DoreenInfrastructure
24 Nov 2026
Design and Construction of Back Creek Pedestrian and Cyclist Bridge and Shared Path – City of Boroondara (Glen Iris)Infrastructure
23 Nov 2026
Port Willunga North Coast Park Shared Path, Bridge and Boardwalk WorksInfrastructure
30 Nov 2026
Stage 3 Construction of Flinders Greenway Active Transport Works – Adelaide Terrace to Byron AvenueInfrastructure
25 Nov 2026
Design and Construction of Dog and Duck Bridge over Bundaburrah Creek (Wirrinya Road, 9 km south of Forbes)Infrastructure
03 Dec 2026
Construction of Pedestrian‑Cyclist Refuge Island and Road Safety Improvements – Henry Lawson Drive, MilperraInfrastructure
24 Nov 2026
Design and Construction of Broughton Street Cycleway – Stage 1Infrastructure
26 Nov 2026
Construction of Wentworth Avenue Cycleway – Kingston Bikeway Stage 2BInfrastructure
08 Dec 2026
Replacement of Bight Bridge over the Manning River, Wingham NSW – MidCoast CouncilInfrastructure
22 Jan 2027
Cuttagee Bridge Replacement at Cuttagee Lake – Two-Lane Bridge with Shared Path (Bega Valley Shire Council)Infrastructure
14 Dec 2026
Footpath Replacement Works 2026/27 — Cheltenham, Beaumaris and Black RockInfrastructure
18 Nov 2026
Kwinana Loop Trail Construction – Stage 1BInfrastructure
08 Dec 2026
Suppliers similar to Conbi Contractors8
SupplierContracts
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






