Construction of Main Switchroom at Mildura South HPPS by CPM Building Contractors
Lower Murray Water · Awarded contract
AwardedConstruction of Main Switchroom at Mildura South HPPS by CPM Building Contractors
Awarded 17 Feb 2022
Awarded17 Feb 2022
Value$212,481.00
SupplierCPM BUILDING CONTRACTORS PTY LTDABN 25 006 906 369
AgencyLower Murray Water
StateVIC
CategoryConstruction
Ended 4y 8mo ago1mo term
Awarded 17 Feb 2022Expired 1 Apr 2022
About
Lower Murray Water awarded a contract to CPM BUILDING CONTRACTORS PTY LTD for the construction of a new Main Switchroom at the Mildura South High Pressure Pumping Station, including concrete floor, lights, power, air conditioning, storm water drainage, access paths, and generator hardstand area.
Similar open tenders12
TenderCloses
Mildura Landfill Pre‑Truck Wash Sewer Works – Pump Station, Sewer Line and Electrical InstallationWater & Sanitation
15 Dec 2026
Ken Harrison Reserve Irrigation Upgrade and Pump Shed Construction – Swan Hill, VICInfrastructure
03 Dec 2026
Design & Construction of Guyra Water Treatment Plant Switchboard Upgrade and Storage FacilitiesWater & Sanitation
19 Jan 2027
Mystic Park Pump Station Replacement – Goulburn-Murray WaterWater & Sanitation
07 Dec 2026
Rahima Court Sewage Pump Station Upgrade – Increase Pumping Capacity and Emergency Storage (Rockhampton)Water & Sanitation
04 Dec 2026
Main Support Works for 2000 MW Borumba Pumped Hydro Project at Lake Borumba (Imbil)Energy & Environment
31 Mar 2028
Replacement of End-of-Life Stormwater Pumps and System Upgrade at MSAC – Supply and Install Two New PumpsWater & Sanitation
09 Dec 2026
Design & Construct Irrigation Pump Station and 230,000 litre Water Tank – Rockhampton Cricket Ground Stage 1BWater & Sanitation
09 Dec 2026
Contract 2963 - Sewage Pumping Station Upgrades (Design & Construct) SPS HB4, L2 & R12Water & Sanitation
11 Dec 2026
Design and Construction of Butler Bay Sewage Rising Main Replacement – Palm IslandWater & Sanitation
04 Dec 2026
Design and Construction of 45 ML Winter Storage at Dimboola Wastewater Treatment PlantWater & Sanitation
21 Jan 2027
Echuca Headquarters Main Switchboard Renewal – Campaspe Shire CouncilConstruction
10 Dec 2026
Suppliers similar to CPM BUILDING CONTRACTORS PTY LTD8
SupplierContracts
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far