Design & Construction of 132kV Substation, 25kV Feeder Station & SCADA at Nowergup
Public Transport Authority · Awarded contract
AwardedDesign & Construction of 132kV Substation, 25kV Feeder Station & SCADA at Nowergup
Awarded 02 Mar 2012
Awarded02 Mar 2012
Value$9,100,569.00
SupplierDowner EDI Engineering Power Ltd (DOWNER EDI ENGINEERING POWER PTY LTD)ABN 53 000 983 700
StateWA
CategoryInfrastructure
Ended 10y 4mo ago4y 5mo term
Awarded 2 Mar 2012Expired 29 July 2016
About
Public Transport Authority awarded a contract to Downer EDI Engineering Power Ltd for the design, construction, supply, installation, and commissioning of a new traction 132 kV substation and 25 kV feeder station at Nowergup.
The works included civil and structural site preparation, 132 kV/25 kV traction substation, 25 kV feeder station, associated return conductor and bonding cables, earthing design, and SCADA system design, installation, and commissioning to integrate with the existing PTA traction SCADA system.
Similar open tenders12
TenderCloses
Energy Queensland – West End Substation Building 2 and Associated Civil Works (EOI)Energy & Environment
02 Dec 2026
Design, Construction and Commissioning of 1.96 km High-Voltage Line and Transformer for Bore 4, WilcanniaInfrastructure
16 Dec 2026
Electrical Infrastructure Upgrade at Blacktown Training Depot, NSWInfrastructure
10 Dec 2026
Long-Term Reliability and System Strength Services for North Country (10–25 Year Contract) — Western PowerEnergy & Environment
01 Feb 2027
Design, Procurement & Construction of 330kV Grid Connection — Parron Maam Marang Wind Farm, Badgingarra WAEnergy & Environment
17 Jul 2027
Design, Manufacture, Supply, Installation & Commissioning of 1.2 MVAR 33 kV Three-Phase System (MR 139/2026)Energy & Environment
02 Dec 2026
Design & Construction of Guyra Water Treatment Plant Switchboard Upgrade and Storage FacilitiesWater & Sanitation
19 Jan 2027
Supply of Indoor 33kV Switchboard — EFLs Nawai Switching Station, NadiInfrastructure
02 Dec 2026
Kentbruck Green Power Hub — 600 MW Wind Farm with Underground Transmission Link to Heywood Terminal StationEnergy & Environment
01 Jun 2028
800 MW Data Centre Development near Bundey Substation, Bundey, South AustraliaIT & Software
11 Nov 2029
Mayne Yard ELP Sheds Fire Protection System Upgrade – Bowen HillsPublic Safety & Security
27 Nov 2026
Tinaroo Environmental Education Centre – New Generator, Shed, Concrete, Drainage & Electrical Works (Design, Supply & Install)Construction
11 Dec 2026
Suppliers similar to Downer EDI Engineering Power Ltd (DOWNER EDI ENGINEERING POWER PTY LTD)8
SupplierContracts
DOWNER EDI ENGINEERING ELECTRICALPublic Services & Welfare
53
Downer EDI rail pty ltdTransport & Logistics
310
Downer EDI WorksInfrastructure
179
Downer EDIConstruction
703
DownerEDi EngineeringConstruction
22
Australian Railway Signalling and Electrical Pty LtdInfrastructure
11
Western PowerInfrastructure
61
DACE Design And Consulting Engineers (Cyberside Pty Ltd)Infrastructure
22
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far