Design of Replacement Abutments for Eidsvold Pedestrian Bridge on Burnett Highway
Transport and Main Roads · Awarded contract
AwardedDesign of Replacement Abutments for Eidsvold Pedestrian Bridge on Burnett Highway
Awarded 05 Mar 2020
About
Transport and Main Roads awarded a contract to The Trustee for Rowen Meyer & Wardel Unit Trust for the design of replacement abutments for the Eidsvold Pedestrian Bridge on the Burnett Highway (Gayndah – Monto).
The contract value is AUD 62,554, procured through a limited method.
Source recordCN-139054350
Similar open tenders12
TenderCloses
Prince Edward Park Woronora Pedestrian Bridge Renewal – Design & ConstructInfrastructure
27 Nov 2026
West Moreton Bridge Renewal Stage 2 — Replacement of Four Timber Rail Bridges on Rosewood–Toowoomba LineInfrastructure
04 Dec 2026
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
01 Dec 2026
Replacement of Congdon Street Bridge over Rail at Swanbourne Train Station – Main Roads Western AustraliaInfrastructure
11 Dec 2026
Design & Construction of Boundary Road Bridge Renewal — ForrestInfrastructure
11 Nov 2026
Construction of Pedestrian‑Cyclist Refuge Island and Road Safety Improvements – Henry Lawson Drive, MilperraInfrastructure
24 Nov 2026
Replacement of Bight Bridge over the Manning River, Wingham NSW – MidCoast CouncilInfrastructure
22 Jan 2027
Whyanbeel Water Main Replacement — Design and Construction on Karnak Road and Whyanbeel RoadWater & Sanitation
02 Dec 2026
Design and Construction of Barrack Street Jetty One Replacement — Department of Transport and Major InfrastructureInfrastructure
10 Nov 2026
Cuttagee Bridge Replacement at Cuttagee Lake – Two-Lane Bridge with Shared Path (Bega Valley Shire Council)Infrastructure
14 Dec 2026
Design and Construction of Fawcett Hall Bridge – Fawcett (2025–2027)Infrastructure
11 Nov 2026
Design and Construction of Back Creek Pedestrian and Cyclist Bridge and Shared Path – City of Boroondara (Glen Iris)Infrastructure
23 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Supply of Eidsvold Pedestrian Bridge by Wagners CFT ManufacturingInfrastructureWagners CFT Manufacturing Pty Ltd
$186,499
Repair of River Rd Overpass Abutment Pedestals and Bearing RealignmentInfrastructureDepartment of Transport & Main Roads
$547,570
Detail Design for Pavement Rehabilitation on Burnett Highway (Gayndah–Monto)InfrastructureHarrison Infrastructure Group Pty Ltd
$62,243
Detail Design for Pavement Rehabilitation on Burnett Highway (Gayndah - Monto)InfrastructureGHD Pty Ltd
$126,671
Detail Design of Cania Dam Road Intersection on Burnett HighwayInfrastructureThe Trustee for Rowen Meyer & Wardel Unit Trust
$125,243
Detail Design for Lamington Bridge Guiderail InstallationInfrastructureThe Trustee for Rowen Meyer & Wardel Unit Trust
$23,100
Detail Design for Cania Dam Road Intersection on Burnett HighwayInfrastructureThe Trustee for Rowen Meyer & Wardel Unit Trust
$109,626
Business Case for Wide Bay Burnett Priority Culvert Structures PlanningInfrastructureThe Trustee for Rowen Meyer & Wardel Unit Trust
$123,563
Burnett Highway Bridge Replacement Business Cases – Biloela to Mount MorganInfrastructureGHD Pty Ltd
$2,054,194
Design of Brigalow Creek Culvert on Burnett Highway and Standard Endwall Design UpdateInfrastructureGHD Pty Ltd
$25,190
Design of Guardrail Works for Beenleigh Redland Bay RoadInfrastructureRoesner and Hamilton Consulting Engineers Pty Ltd
$366,656
Detailed Design of Burnett Highway 41E Sections under Road Safety ProgramInfrastructureHarrison Infrastructure Group Pty Ltd
$249,700
Suppliers similar to The Trustee for Rowen Meyer & Wardel Unit Trust8
SupplierContracts
Andrew Walter ConstructionsInfrastructure
52
NQ Project Engineering Pty LtdConsultancy & Legal
1
Shaw Contracting (Aust) Pty LtdInfrastructure
71
D.A.C. Enterprises Pty LtdInfrastructure
50
Bielby BMD Joint VentureInfrastructure
2
Garli Pty LtdInfrastructure
32
Highway ConstructionInfrastructure
33
Bild GroupInfrastructure
53
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far