Design Services for PTOCC Stage 3 Fit-Out by Rail Systems Australia
Public Transport Authority · Awarded contract
AwardedDesign Services for PTOCC Stage 3 Fit-Out by Rail Systems Australia
Awarded 29 May 2025
Awarded29 May 2025
Value$209,765.00
StateWA
CategoryTransport & Logistics
Ended 12mo ago6mo term
Awarded 29 May 2025Expired 28 Nov 2025
About
Public Transport Authority awarded a contract to Rail Systems Australia (Systra Rail Systems Australia Pty Ltd) for design services for the Public Transport Operations Control Centre (PTOCC) Stage 3 fit-out, including concept and reference designs for building works and communications & operational technology.
Similar open tenders12
TenderCloses
RFI: Technology Products, Platforms and Integration Services for Queensland Transport Coordination Centre (TCC)IT & Software
16 Nov 2026
Design and Construction of Vertical Transport Asset Replacement — Stage 1 (Public Transport Authority)Transport & Logistics
05 Jan 2027
Roma Street Connect Main Works Package – Station Lifts, Escalators and Accessibility UpgradesTransport & Logistics
30 Nov 2026
Design, Manufacture and Installation of Prototype Testing Display – Public Transport AuthorityTransport & Logistics
25 Nov 2026
Systems Frameworks Package – Sydney Metro West 24 km Underground Metro (Parramatta to Sydney CBD)Transport & Logistics
13 Jul 2028
Sydney Metro West – Trains, Systems and Maintenance Operations ContractTransport & Logistics
30 Oct 2027
C‑Bus Decommissioning and Electrical Services – Sydney Olympic Park (Stage 2)Infrastructure
24 Nov 2026
Technical Advisor Services for Aerotropolis Bus Depot – Transport for NSWTransport & Logistics
19 Nov 2026
Queensland Rail Trackside Safety Training and Competency Assessment PanelEducation & Training
20 Nov 2026
Parramatta Light Rail Stage 2 Enabling Works — $322M Contract Awarded to John HollandTransport & Logistics
30 Apr 2027
Sydney Metro 66 km Standalone Metro Railway and 31 Stations (2024)Transport & Logistics
31 Dec 2026
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
01 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Design of PTOCC Stage 3 Fit-Out by Architectus Group for Public Transport AuthorityConstructionArchitectus Group (Architectus Australia Pty Ltd)
$223,683
Design Services for PTOCC Stage 3 Fit-Out by WSP AustraliaInfrastructureWSP Australia Pty Ltd
$247,680
Design and Fit-Out of Public Transport Operations Control Centre Stages 3a-3c by OPRA ProjectsConstructionOPRA Projects (OPRA Group Australia Pty Ltd)
$7,244,282
Design and Construction of Public Transport Operations Control Centre by ADCO ConstructionsConstructionADCO Constructions Pty Ltd
$46,512,557
Development of Rail Operations Control Centre Strategy by Arup for Public Transport AuthorityConsultancy & LegalArup Australia Pty Ltd
$99,000
Provision of Hydraulic Project Engineer for PTOCC Stage 3 Fit-Out by Public Transport AuthorityTransport & LogisticsJacobs Group (Australia) Pty Ltd
$64,416
Provision of Engineering Assurance Services for PTOCC Stage 3 Fit-Out by Public Transport AuthorityTransport & LogisticsFlint Engineering (Flint Engineering Pty Ltd)
$66,763
Provision of Project Engineer for PTOCC Stage 3 Fit-Out by Public Transport AuthorityTransport & LogisticsCameron Chisholm Nicol (Cameron Chisholm & Nicol (WA) Pty Ltd)
$228,800
Operations Project Engineering Services for Automatic Train Control Project by Public Transport AuthorityTransport & LogisticsAustralis Rail Consulting Pty Ltd
$154,440
Supplied and Installed 20 Operator Workstations for PTOCC Interim NCC to Public Transport AuthorityIT & SoftwareCADwalk Critical Rooms Pty Ltd
$1,216,054
Development of Concept of Operations for Public Transport Operations Control Centre by Arup AustraliaTransport & LogisticsArup Australia Pty Ltd
$286,806
Lead Design Consultant for Rail Operations Control CentreInfrastructureAurecon Perth (Aurecon (Australia) Pty Ltd)
$395,681
Suppliers similar to Rail Systems Australia (Systra Rail Systems Australia Pty Ltd)8
SupplierContracts
MGB InternationalTransport & Logistics
9
Australian Railway Signalling and Electrical Pty LtdInfrastructure
11
Siemens Mobility Pty. Ltd.Transport & Logistics
226
MGC SolutionsTransport & Logistics
7
RGB AssuranceConsultancy & Legal
44
Australis Rail Consulting Pty LtdTransport & Logistics
9
Ansaldo STS Pty LtdTransport & Logistics
22
Gazelle Systems Advisory Pty LtdInfrastructure
4
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open transport and logistics tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






