Feasibility Marine Structural Engineering for Transperth Ferry Landings awarded to Arup
Awarded 11 Sep 2024
About
Public Transport Authority awarded a contract to Arup (Arup Australia Pty Limited) for a feasibility-stage marine structural engineering engagement to support Stage 1 of an expanded Transperth ferry service.
Arup developed concept structural designs and provided preliminary structural assessments for new and augmented ferry landings and an overnight berthing facility to improve cost accuracy and inform the business case.
The scope included review of concept architectural designs to advise on minimal-pile options and opportunities to remove or rationalise pile numbers; preparation of initial feasibility marine structure designs using desktop-available information; provision of limited iterative feedback to the architect; advice on additional concept-level studies to de-risk future design stages; and development of concept structural designs following receipt of geophysical information and updated architectural designs to achieve a cost estimate window of ±30%.
The works covered three new ferry landings (Applecross, Canning Bridge, UWA/Crawley), augmentation of the Elizabeth Quay landing, and an overnight berthing facility at Ellam St.
Further packages for later delivery stages were to be procured separately.
Similar open tenders12
Suppliers similar to Arup (Arup Australia Pty Limited)8
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






