Fire Protection Engineering Services for Byford Rail Extension Stage 2
Public Transport Authority · Awarded contract
AwardedFire Protection Engineering Services for Byford Rail Extension Stage 2
Awarded 16 May 2025
Awarded16 May 2025
Value$168,300.00
SupplierFlint Engineering (Flint Engineering Pty Ltd)ABN 87 611 194 177
StateWA
CategoryInfrastructure
Expires in 6mo2y term, 75% elapsed
Awarded 16 May 2025Expires 21 May 2027
About
Public Transport Authority awarded a contract to Flint Engineering (Flint Engineering Pty Ltd) for fire protection, detection, and safety project engineering services on the Byford Rail Extension Stage 2 Main Cable Route (MCR) South.
The contractor will provide a Project Engineer to review design and construction documents and provide technical input during procurement, construction, and commissioning to ensure compliance with Australian and PTA Standards, including the PTA Engineering Management for Projects (EM4P) Procedure and Project Requirements Specifications.
Similar open tenders12
TenderCloses
Mayne Yard ELP Sheds Fire Protection System Upgrade – Bowen HillsPublic Safety & Security
27 Nov 2026
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
01 Dec 2026
Parramatta Light Rail Stage 2 Enabling Works — $322M Contract Awarded to John HollandTransport & Logistics
30 Apr 2027
Maintenance and Servicing of Fire Protection Systems for Metro Public Health Services – HealthShare VictoriaPublic Safety & Security
06 Dec 2026
Moe Rail Crossing Upgrade and Associated RoadworksTransport & Logistics
18 Nov 2026
Design and Construction of Ayr Fire & Rescue Station — 18–36A Chippendale Street, Ayr QLDConstruction
17 Nov 2026
West Moreton Bridge Renewal Stage 2 — Replacement of Four Timber Rail Bridges on Rosewood–Toowoomba LineInfrastructure
04 Dec 2026
Design and Construction of Vertical Transport Asset Replacement — Stage 1 (Public Transport Authority)Transport & Logistics
05 Jan 2027
Replacement of Congdon Street Bridge over Rail at Swanbourne Train Station – Main Roads Western AustraliaInfrastructure
11 Dec 2026
Owner's Engineer Services for Story Bridge Renewal Program – Packages 2 & 3Infrastructure
20 Nov 2026
Systems Frameworks Package – Sydney Metro West 24 km Underground Metro (Parramatta to Sydney CBD)Transport & Logistics
13 Jul 2028
Rail Revitalisation Maintenance and Repair Services – Inner Midland (Public Transport Authority)Transport & Logistics
13 Jan 2027
Suppliers similar to Flint Engineering (Flint Engineering Pty Ltd)8
SupplierContracts
Complete Fire DesignConsultancy & Legal
12
firesafe groupConstruction
15
RED FIRE ENGINEERS PTY LTDConsultancy & Legal
13
Firesafe Service & Maintenance Pty LtdPublic Safety & Security
8
Calibre Professional Services One Pty LtdTransport & Logistics
15
FIRE & SAFETY SERVICES CO PTY LTDPublic Safety & Security
49
BG&E Pty LtdInfrastructure
151
Stephen Grubits & AssociatesConsultancy & Legal
3
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






