Groundwater Prevention Variations at Lotus Glen Correctional Centre
Department of Energy and Public Works · Awarded contract
AwardedGroundwater Prevention Variations at Lotus Glen Correctional Centre
Awarded 21 Nov 2023
Awarded21 Nov 2023
Value$527,638.10
SupplierNUFLOW CAIRNS FNQABN 97090200192
StateQLD
CategoryConstruction
About
The Department of Energy and Public Works awarded a contract to NUFLOW CAIRNS FNQ for groundwater prevention variations at the Lotus Glen Correctional Centre.
The contract, valued at AUD 527,638.1, was procured through a limited procurement method under the building construction and maintenance category.
Source record18-20 JOSEPH BANKS CLOSE KEWARRA BEACH, QLD 4879
Similar open tenders12
TenderCloses
Feasibility Study and Design of Water and Wastewater Upgrades – Alice Springs Correctional CentreWater & Sanitation
30 Nov 2026
Construction of Landfill Cell 3C and Associated Works – Nambucca Valley Waste Management FacilityEnergy & Environment
07 Dec 2026
Construction Quality Assurance Consultancy for Bowen Landfill Cell 2 – Bowen, QueenslandEnergy & Environment
19 Nov 2026
Construction of Maturation Pond 1 for Texas Wastewater Treatment Plant Upgrade – Goondiwindi Regional CouncilWater & Sanitation
20 Nov 2026
Gayndah Wastewater Treatment Plant Upgrade – Pond 2 Rock Filter Rehabilitation & Disinfection ImprovementsWater & Sanitation
30 Nov 2026
Waste Disposal and Treatment Services for Casuarina Prison – Department of JusticeEnergy & Environment
17 Nov 2026
Parade Ground Upgrades at Fremantle Prison — Infrastructure, Surfacing and Paving WorksInfrastructure
26 Nov 2026
Gatehouse and Associated Civil Works at University Drive Waste Facility – Bundaberg Regional Council (TEN/2798)Construction
17 Nov 2026
Warrina Lakes Building Short-Term Structural and Stormwater Risk Mitigation Works – Innisfail QLDConstruction
26 Nov 2026
Remediation of Lagoon No. 1 & No. 2 at Tatura WMF – Goulburn Valley WaterWater & Sanitation
17 Nov 2026
Waste Disposal and Treatment Services for Karnet Prison Farm – Department of JusticeEnergy & Environment
17 Nov 2026
Water and Wastewater Condition Assessment – Douglas Shire Council (Post‑Tropical Cyclone Jasper)Water & Sanitation
03 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Water Control System Upgrade at Lotus Glen Correctional Centre with Annual MaintenanceWater & SanitationAVAC AUSTRALIA PTY LTD
$49,294.3
Construction of 15ML Potable Water Dam at Lotus Glen Correctional CentreWater & SanitationWATTO'S EARTHMOVING&MACH HIRE PL
$912,974.7
Geotechnical Investigation for Lotus Glen Correctional CentreConstructionDOUGLAS PARTNERS PTY LTD
$10,846
Fencing Work at Lotus Glen Correctional Centre Workshop 3 WalkwayConstructionCAIRNS FENCING
$52,250
Fence and Gate Upgrade at Lotus Glen Correctional Centre Multi-Purpose HallConstructionCAIRNS FENCING
$75,680
Overhaul of BWTP Irrigation Dam/Aerator at Lotus Glen Correctional CentreWater & SanitationACRON PTY LTD
$14,850
Replacement of BWTP Irrigation Pump Set at Lotus Glen Correctional CentreInfrastructureACRON PTY LTD
$13,475
Supply and Delivery of Paint Materials to Lotus Glen Correctional CentreConstructionCAIRNS COATINGS (NQ) PTY LTD
$10,105.15
Design Consultancy for Wastewater Upgrade at Lotus Glen Correctional CentreWater & SanitationVIRIDIS CONSULTANTS PTY LTD
$11,419.98
Cathodic Protection System Upgrade at Lotus Glen Correctional CentreConstructionCORROSION CONTROL ENGINEERING
$13,409
Wet Area Upgrade at Lotus Glen Correctional Centre – S.C.A.M Unit 1ConstructionA.D FRASER BUILDERS PTY LTD
$104,038
Replacement of MMF System at Lotus Glen Correctional Centre Water Treatment PlantWater & SanitationACRON PTY LTD
$189,750
Suppliers similar to NUFLOW CAIRNS FNQ8
SupplierContracts
Drainflow Services Pty LtdInfrastructure
12
CONTRACT PLUMBING & DRAINAGE P/LConstruction
8
SOUTHERN CROSS FACILITIES SERV
0
S.S Lynch & T Lynch
0
SMEDLEY PLUMBING & DRAINAGEConstruction
15
Rangedale DrainageWater & Sanitation
5
Waste Water WorksWater & Sanitation
11
Total Drain Cleaning Services Pty LtdInfrastructure
10
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far