Integrated Land Use and Transport Plan for Wanneroo Road Corridor by Arup
(inactive) Department of Transport · Awarded contract
AwardedIntegrated Land Use and Transport Plan for Wanneroo Road Corridor by Arup
Awarded 09 May 2022
Awarded09 May 2022
Value$623,935.00
SupplierArup Pty LtdABN 18 000 966 165
StateWA
CategoryInfrastructure
About
(inactive) Department of Transport awarded a contract to Arup Pty Ltd for the Wanneroo Road Activity Corridor Plan - Integrated Land Use and Transport Plan, covering transport planning and modelling services under the DOT407616eoi panel.
Similar open tenders12
TenderCloses
Design & Documentation Consultancy for Black Spot, Road Improvement and LATM Projects – City of WannerooInfrastructure
20 Nov 2026
Intersection Improvement Works – Karrinyup Morley Highway, Wellington Road & Camboon RoadInfrastructure
04 Dec 2026
Anketell Road Upgrade Alliance Contract — Leath Road to Abercrombie Road (Main Roads WA)Infrastructure
01 Dec 2026
Project Manager – Technical Planning for Sector 1 North (Department of Transport and Main Roads)Transport & Logistics
30 Nov 2026
Mundara Drive Local Area Traffic Management and Drainage Improvement Works – Maroondah City Council (Ref 21126)Infrastructure
27 Nov 2026
Flynn Drive Duplication – Wanneroo Road to Old Yanchep Road Major Works (Three Stages)Infrastructure
08 Dec 2026
Environment and Heritage Services Panel Contract – Main Roads Western AustraliaEnergy & Environment
09 Dec 2026
Design and Construction Registration of Interest – Maitland Westbound Upgrade, New England HighwayInfrastructure
11 Dec 2026
Resurfacing of Various Metro Region Roads (FY 26-27) — Department of Transport and PlanningInfrastructure
24 Nov 2026
FY27 Road Linemarking Works — Barwon Southwest Region (Regional Package)Infrastructure
25 Nov 2026
Alice Springs - Stuart Highway and Schwarz Crescent Intersection UpgradeInfrastructure
01 Dec 2026
Victoria Transport Infrastructure Projects – Rail, Road and Urban MobilityTransport & Logistics
12 Jun 2030
Other similar contracts12
Contract and supplierAwarded value
Integrated Land Use Planning and Transport Study for Orrong Road ExpresswayInfrastructureArup Pty Ltd
$126,225
Integrated Land Use and Transport Modelling for Melbourne's South East Corridor by Arup Pty LtdTransport & LogisticsArup Pty Ltd
$143,000
Traffic and Transport Assessment for North-East Corridor Sub-Regional Structure PlanConsultancy & LegalArup Pty Ltd
$43,084
Concept Design of East Wanneroo District Railway Alignment by Arup for Public Transport AuthorityInfrastructureArup Pty Ltd
$73,420
Active Transport Infrastructure Research and Planning Services for Transport and Main RoadsConsultancy & LegalARUP AUSTRALIA PTY LTD
$330,000
Provided engineering design and advisory services for Guildford Road Integrated Transit Corridor feasibilityTransport & LogisticsArup (Arup Australia Pty Limited)
$154,727
Traffic Modelling for Wanneroo Road Corridor by Flyt Pty LtdTransport & LogisticsFlyt Pty Ltd
$92,310
Traffic and Transport Planning Consulting Services by Arup Pty Ltd for East Perth Redevelopment AuthorityTransport & LogisticsArup Pty Ltd
$21,340
Preliminary Design and Network Review for Mandjoogoordap Drive Active Transport CorridorInfrastructureWSP Australia Pty Ltd
$132,701
Development of Multi-Modal Transport Models for East Wanneroo District Structure Plan AreaInfrastructureWSP (Parsons Brinkerhoff)
$159,728
Consultancy Services for Light Rail Land Use Planning and Economic AnalysisConsultancy & LegalUrbis Pty Ltd
$170,847
Traffic and Transport Assessment for West Schofields Precinct Plan by Arup AustraliaInfrastructureArup Australia Pty Ltd
$203,120
Suppliers similar to Arup Pty Ltd8
SupplierContracts
Arup AustraliaConsultancy & Legal
414
Arup Group LimitedConsultancy & Legal
110
Ove ArupConsultancy & Legal
23
ARUP AUSTRALIA SERVICES PTY LTDTransport & Logistics
2
Arcadis Australia Pacific Pty LtdConsultancy & Legal
146
URS Australia Pty LtdConsultancy & Legal
351
Opus International ConsultantsInfrastructure
62
Northrop Consulting EngineersConsultancy & Legal
117
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






