Awarded 11 Aug 2021
Awarded11 Aug 2021
Value$481,664.00
SupplierErgon Energy Corporation Limited
AgencyTransport and Main Roads
StateQLD
CategoryEnergy & Environment
About
Transport and Main Roads awarded a contract to Ergon Energy Corporation Limited for the relocation of high-voltage feeder exits from the Glenella Substation associated with the MRRBHC project along Glenella-Richmond Road.
The contract value is AUD 481,664 and was procured through a single-source method.
Source recordCN-174834810
Similar open tenders12
TenderCloses
Utility Design Adjustment Services — Golden Highway Denman to Sandy Hollow Safety Upgrades & Central West Orana REZ Pullover BaysInfrastructure
16 Nov 2026
HumeLink East Transmission Reinforcement — Bannaby to WondalgaEnergy & Environment
30 Dec 2027
Overhead and Underground Power Relocation for Intersection Upgrade — Allfield Rd & Blackwall Rd (MR349)Infrastructure
18 Nov 2026
Utility Relocation for Terry Tongarra Left Slip Lane — Water, Sewer, HV/LV, Street LightingInfrastructure
25 Nov 2026
Hunter-Central Coast Renewable Energy Zone — Transmission Lines, Energy Hubs and Substation UpgradesEnergy & Environment
31 Dec 2028
Construction of Pedestrian‑Cyclist Refuge Island and Road Safety Improvements – Henry Lawson Drive, MilperraInfrastructure
24 Nov 2026
Ausgrid HV Augmentation and Early Works for Apex Park Redevelopment — Cessnock City CouncilConstruction
11 Nov 2026
Suburban Connect Tunnelling Works Package C – Cheltenham to Glen W.Transport & Logistics
22 Apr 2028
Tunnelling Works Package C – Suburban Connect (Cheltenham to Glen W...)Transport & Logistics
22 Apr 2028
Construction of High-Capacity Transmission Lines and Energy Hubs – Central‑West Orana REZ Transmission ProjectEnergy & Environment
23 Dec 2030
Design, Procurement & Construction of 330kV Grid Connection — Parron Maam Marang Wind Farm, Badgingarra WAEnergy & Environment
17 Jul 2027
Kentbruck Green Power Hub — 600 MW Wind Farm with Underground Transmission Link to Heywood Terminal StationEnergy & Environment
01 Jun 2028
Other similar contracts12
Contract and supplierAwarded value
Relocation of HV Cables and Pole Ownership Transfer for TMR Bald Hills Mackay ProjectInfrastructureErgon Energy Corporation Limited
$725,540
Relocation of Ergon Energy Assets for Gin Gin HVRA ProjectInfrastructureErgon Energy
$21,659
Relocation of Power Poles and House Feeders at Kennedy Hwy & Moore St, RavenshoeInfrastructureErgon Energy Corporation Limited
$29,902
Street Lighting Works for Glenella-Richmond Road Overpass by Ergon EnergyInfrastructureErgon Energy
$114,429
NBN Fibre Optic Relocation for MRRBHC Road CorridorTelecommunicationsNBN Co Limited
$91,514
Relocation of Ergon Power Poles at HRDR & Rangewood Dr IntersectionInfrastructureErgon Energy Corporation Limited
$258,472
Ergon Relocation Works for Tranche 2A and Gairloch ProjectsInfrastructureERGON ENERGY CORPORATION LIMITED
$333,570
Powerline Relocation for Park Ridge Connector by Transport and Main RoadsInfrastructureB.B.H. Pty Ltd as trustee for BBH Practice Trust
$17,275
Relocation of Energex Assets for Bruce Highway Upgrade at Forest Glen – Stage 2InfrastructureENERGEX
$444,709
Negotiated Connection Establishment for Street Lighting with Ergon EnergyInfrastructureErgon Energy Corporation Limited
$113,638
Relocation of Ergon Energy Service Along Highfields Cycleway Stage 2InfrastructureErgon Energy
$61,636
High Voltage Electricity Supply for Rockhampton RailyardsEnergy & EnvironmentErgon Energy Pty Ltd
$42,486
Suppliers similar to Ergon Energy Corporation Limited8
SupplierContracts
Ergon Energy Queensland Pty Ltd t/a Ergon EnergyEnergy & Environment
24
Origin Energy Electricity Pty LtdEnergy & Environment
70
EnergyAustralia Pty LtdEnergy & Environment
134
ENERGEX LIMITEDInfrastructure
109
Perth EnergyEnergy & Environment
182
Origin EnergyEnergy & Environment
220
RIGIN ENERGY ELECTRICITY LIMITEDEnergy & Environment
13
United Energy DistributionInfrastructure
12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far