Supplied and Installed Actuator Valves to 46 Fan Coil Units in W Block, Fremantle Hospital
South Metropolitan Health Service · Awarded contract
AwardedSupplied and Installed Actuator Valves to 46 Fan Coil Units in W Block, Fremantle Hospital
Awarded 23 Dec 2024
Awarded23 Dec 2024
Value$252,384.00
SupplierGreenstar Group (WA) Pty Ltd (Greenstar Group WA Pty Ltd)ABN 16 145 204 860
StateWA
CategoryConstruction
Ended 4mo ago1y 7mo term
Awarded 23 Dec 2024Expired 7 July 2026
About
South Metropolitan Health Service awarded a contract to Greenstar Group (WA) Pty Ltd (Greenstar Group WA Pty Ltd) for the supply and installation to replace actuator valves to all 46 fan coil units located on levels 4 & 5 of W Block at Fremantle Hospital.
The work covered replacement of actuator valves across the 46 fan coil units on levels 4 and 5 of W Block and comprised both supply and installation of the replacement components.
Similar open tenders12
TenderCloses
Replacement of Fan Coil and Water‑Cooled Packaged Air Conditioning Units – Bankstown Civic Tower, NSWConstruction
07 Dec 2026
Supply, Installation and Commissioning of High-Capacity Coolers – West Gippsland Healthcare GroupHealth & Medical
20 Nov 2026
Removal and Supply/Installation of HVAC Heating System – Springwood Aquatic and Fitness CentreConstruction
01 Dec 2026
Cladding Remediation at Fiona Stanley Hospital Building B – South Metropolitan Health ServiceConstruction
03 Dec 2026
Replacement of Three Air‑Cooled Chillers at Longreach Hospital – Longreach QLDConstruction
14 Dec 2026
Replacement of Hot and Chilled Water Plant at SCGHConstruction
07 Dec 2026
Replacement of End-of-Life Stormwater Pumps and System Upgrade at MSAC – Supply and Install Two New PumpsWater & Sanitation
09 Dec 2026
HVAC Modifications and New Plant Installation — Joyce Palmer Health Service, Palm Island (Townsville HHS)Construction
22 Jan 2027
Chiller and Cooling Tower Replacement — Building 16, Joondalup (Edith Cowan University)Construction
20 Nov 2026
Alice Springs Hospital – Plumbing and Hydraulic Maintenance & Minor Works (36-Month Contract)Construction
01 Dec 2026
Gregadoo Waste Management Centre – Replacement & Maintenance of Nine Extraction PumpsWater & Sanitation
20 Nov 2026
Refurbishment of Main Ward Block Levels 2, 4, 6 and 7 – Alfred Hospital Urgent Infrastructure Main WorksConstruction
13 May 2027
Suppliers similar to Greenstar Group (WA) Pty Ltd (Greenstar Group WA Pty Ltd)8
SupplierContracts
Greenstar Mechanical ServicesConstruction
8
West Australian Mechanical Services (West Australian Mechanical Services Pty Ltd)Construction
50
Australian HVAC Services Pty LtdConstruction
60
Australian Airconditioning ServicesConstruction
46
Grosvenor Engineering GroupConstruction
156
Engie Mechanical Services Pty LtdConstruction
74
Canberra Air Conditioning ServicesConstruction
30
Centigrade ServicesConstruction
29
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far