Timber Replacement for Lake Yandelora Foot Bridge by HDSA Group
Camden Council · Awarded contract
AwardedTimber Replacement for Lake Yandelora Foot Bridge by HDSA Group
Awarded 10 Nov 2025
Awarded10 Nov 2025
Value$137,604.00
SupplierHDSA GROUP
AgencyCamden Council
StateNSW
CategoryInfrastructure
About
Camden Council awarded a contract to HDSA Group for the timber replacement of the Lake Yandelora Foot Bridge, valued at $137,604.00.
Similar open tenders12
TenderCloses
Helen Street Footbridge Replacement – Design, Fabrication & Construction (Byron Shire Council)Infrastructure
22 Dec 2026
Timber Bridge Repair and Rehabilitation for Road Bridges – Mount Alexander Shire 2026–2027Infrastructure
11 Dec 2026
Construction of Yan Yean Pipe Track Shared Path – Bridge Inn Road to Hazel Glen Drive, DoreenInfrastructure
27 Nov 2026
Cuttagee Bridge Replacement at Cuttagee Lake – Two-Lane Bridge with Shared Path (Bega Valley Shire Council)Infrastructure
14 Dec 2026
Road, Footpath and Drainage Rehabilitation Works – Yarra City CouncilInfrastructure
04 Dec 2026
Prince Edward Park Woronora Pedestrian Bridge Renewal – Design & ConstructInfrastructure
11 Dec 2026
Back Creek and Tanduringie Creek Bridge Upgrades – New England Hwy (Yarraman–Toowoomba) & Kingaroy–Cooyar RdInfrastructure
20 Jan 2027
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
15 Dec 2026
Design and Construction of Dog and Duck Bridge over Bundaburrah Creek (Wirrinya Road, 9 km south of Forbes)Infrastructure
03 Dec 2026
Port Willunga North Coast Park Shared Path, Bridge and Boardwalk WorksInfrastructure
30 Nov 2026
Bridge Renewal (Construct Only) – Silks Access, Carlisle River — Colac Otway Shire CouncilInfrastructure
02 Dec 2026
West Moreton Bridge Renewal Stage 2 — Replacement of Four Timber Rail Bridges on Rosewood–Toowoomba LineInfrastructure
11 Jan 2027
Other similar contracts12
Contract and supplierAwarded value
Design and Construction of Nogoa River Pedestrian BridgeInfrastructureD&M Composites Pty Ltd
$1,527,265.2
Reconstruction of Lewis Road Bridge in YinnarInfrastructureJarvis Norwood Constructions
$354,200
Belyando River Timber Bridge Replacement Option Analysis and Business CaseInfrastructureJacobs Group (Australia) Pty Limited
$219,906
Rehabilitation of Gardiners Creek Reserve Footbridge in AshwoodInfrastructureTeleo Design Pty Ltd
$97,861.5
Restoration and Redevelopment of Old Goulburn River Bridge by Duratec LimitedInfrastructureDuratec Limited
$4,936,670.28
Design and Construct Contract for Replacement of Two Timber BridgesInfrastructureCentral Industries
$1,242,186
Demolition of Nogoa Timber Bridge by Ve Group Pty LtdInfrastructureVe Group Pty Ltd
$588,851.09
Construction of New Footpath Links – Stage 2 by Maribyrnong City CouncilInfrastructureTDL Contractors P/L
$208,916
Restoration of Timber Bridge by RailInfrastructureTIMBER RESTORATION SYSTEMS
$16,500
Bridge Handrail Replacement Works for City of NewcastleInfrastructureJAB Civil and Structural Pty Ltd
$245,301
Rehabilitation of Duerdin Street Bridge in Notting HillInfrastructureJAYDO CONSTRUCTION PTY LTD
$1,447,519
Replacement of Two Road Bridges at Harrys Hut with Environmental Management PlanConstructionTIMBER RESTORATION SYSTEMS P/L
$71,343.8
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






