Tender: Bayu-Undan Carbon Capture and Storage – Capture up to 10 Mtpa CO2 at Darwin Hub (initially from Darwin LNG)
Released about 1 year ago
About
The Bayu-Undan Carbon Capture and Storage (CCS) Project is seeking suppliers to deliver capture and storage solutions targeting up to 10 Mtpa of CO2 at a Darwin hub, initially sourced from the Darwin LNG facility (DLNG). The project focuses on establishing large-scale CCS capacity at Darwin to manage significant CO2 volumes.
This could be valuable for firms with experience in large-scale carbon capture and storage and in working alongside LNG operations. Key considerations include the technical and logistical demands of handling and storing up to 10 Mtpa of CO2 and integrating project activities with an operational LNG facility (Darwin LNG).
Tender breakdown
From 4 documentsYou must submit your EOI at the correct Tier level (Full Scope Tier 1 or Partial Scope Tier 2).
Full Scope (Tier 1) means able to produce/supply all of the package; Partial Scope (Tier 2) means able to produce/supply some of the package.
EOIs must be completed via the ICN Gateway BayuUndanCCS.icn.org.au (missing or incorrect submission route could disqualify you).
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents4
Grouped by what each file is for
Similar open tenders5
Similar awarded contracts12
Likely value $1.0B to $20.0BAgency spend history
SANTOS LTDContract size
What SANTOS LTD has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.