SPARK RENEWABLES PTY LIMITED · ICN Gateway
Open

Tender: Dinawan Wind Farm – Installation, Operation, Maintenance and Decommissioning of 53 Wind Turbines

Released about 1 year ago

Closes31 Dec 2029
Likely valueRough estimate$120.0M to $1.6BInflation adjusted
LocationNot specified
AgencySPARK RENEWABLES PTY LIMITED
SourceICN Gateway
CategoryEnergy & Environment
1142 days leftCloses Mon, 31 Dec 2029

Dinawan Wind Farm project is seeking suppliers for the installation, operation, maintenance and decommissioning of 53 wind turbine generators (WTGs) and associated infrastructure.

Tender breakdown

From 1 document
ICN Gateway supplier profile creation
Watch out for5

At least one industry capability must be selected — mandatory

One contact must be selected as the primary contact — mandatory

Certificate upload file type and size limits: PDF only, max 2.0 MB

Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.

Documents1

Grouped by what each file is for

Guides and policies1Background: buyer policies, guides and portal instructions.
1 potential contact foundLocked
Auto-detected from the tender listing & documents. Verify before relying on them.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month