Tender: Hills of Gold Wind Farm — Construction, Operation and Commissioning of up to 62 Turbines (Up to 372MW)
Released 5 months ago
About
Construction and operations company needed to deliver the Hills of Gold Wind Farm, involving the construction, operation and commissioning of a wind farm with up to 62 wind turbines which will generate up to 372MW of clean, as described in the tender.
Tender breakdown
From 4 documentsSome form fields may be pre-filled from previous EOIs; check all answers carefully because qualification may rely on them.
Submitting an EOI requires a Gateway business profile and you must be logged in.
EOIs can be saved and edited multiple times but must be submitted before the closing date.
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents4
Grouped by what each file is for
Similar open tenders12
Agency spend history
SOMEVA PTY LTDContract size
What SOMEVA PTY LTD has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






