Tender: Eva Copper Project — Conventional Open‑Pit Copper Mining and Processing (crush, grind, gravity)
Released about 1 year ago
About
Eva Copper Project seeks contractors for conventional open‑pit copper mining and processing at the Copper Mountain Mine, which has the potential to be the lowest GHG‑emitting open pit copper mine in the world. The work focuses on a conventional flow sheet including crushing, grinding and gravity concentration.
Tender breakdown
From 4 documentsMust include draft ITPs, draft management plans, plant list, draft schedule (Primavera P6 or MS Project) and proposed ITPs in tender submission; many hold points are mandatory and ITPs must show hold/witness points
Many mandatory pre-conditions before receiving an order: insurance certificates, employee medicals (<12 months), vehicle/equipment inspection proofs and equipment inspection sheet completed by third party
Work done without RFI clarification is at contractor risk and cost; allow time in programme for RFIs
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents4
Grouped by what each file is for
Similar open tenders12
Similar awarded contracts12
Likely value $25.0M to $800.0MAgency spend history
EVA COPPER MINE PTY LTDContract size
What EVA COPPER MINE PTY LTD has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.