EVA COPPER MINE PTY LTD · ICN Gateway
Open

Tender: Eva Copper Project — Conventional Open‑Pit Copper Mining and Processing (crush, grind, gravity)

Released about 1 year ago

Closes30 Jun 2028Updated
Likely valueRough estimate$25.0M to $800.0MInflation adjusted
LocationNot specified
AgencyEVA COPPER MINE PTY LTD
SourceICN Gateway
CategoryMining & Natural Resources
592 days leftCloses Fri, 30 June 2028

Eva Copper Project seeks contractors for conventional open‑pit copper mining and processing at the Copper Mountain Mine, which has the potential to be the lowest GHG‑emitting open pit copper mine in the world. The work focuses on a conventional flow sheet including crushing, grinding and gravity concentration.

Tender breakdown

From 4 documents
tank farm civil constructionOther
Watch out for3

Must include draft ITPs, draft management plans, plant list, draft schedule (Primavera P6 or MS Project) and proposed ITPs in tender submission; many hold points are mandatory and ITPs must show hold/witness points

Many mandatory pre-conditions before receiving an order: insurance certificates, employee medicals (<12 months), vehicle/equipment inspection proofs and equipment inspection sheet completed by third party

Work done without RFI clarification is at contractor risk and cost; allow time in programme for RFIs

Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.

Documents4

Grouped by what each file is for

Other documents4Everything else attached to this tender.
1 potential contact foundLocked
Auto-detected from the tender listing & documents. Verify before relying on them.

Similar open tenders12

Similar awarded contracts12

Likely value $25.0M to $800.0M

Agency spend history

EVA COPPER MINE PTY LTD

What EVA COPPER MINE PTY LTD has spent, year by year and by contract size, and who won the work.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open mining and natural resources tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month