Tender: Richmond Catchment Flood Study – Stages 2 & 3: Catchment-wide Flood Modelling and Risk Mitigation Options
Released about 12 hours ago
About
NSW Reconstruction Authority is seeking a specialist consultant to deliver Stages 2 and 3 of the Richmond Catchment Flood Study, including catchment-wide modelling and options assessment. Stage 2 builds on the consolidated Stage 1 modelling platform to produce robust estimates of design flood behaviour and climate change scenarios, with emphasis on local variability of model inputs and an envisaged Monte Carlo or ensemble modelling approach; scope items include review of Stage 1 models, general and specialist investigations of key flooding drivers, selection and modelling of representative design flood and evacuation events, calibration to Flood Frequency Analysis at appropriate stream gauges, and assessment of climate change impacts using the latest Australian Rainfall and Runoff guidance. Stage 3 involves modelling flood risk reduction options to assess changes in flood behaviour throughout the Richmond River catchment. Deliverables include technical reporting, mapping, presentations and technical memoranda on key methodological decisions, and full model, GIS, report and data handover, with further detail in the Statement of Requirements available from the NSW Reconstruction Authority Procurement Branch. Suppliers wishing to obtain details of the scope of work and associated tender documentation must complete and submit the Confidentiality Deed to [email protected], attention: Ambika Girglani, Contact Officer.
Similar open tenders12
Similar awarded contracts12
Likely value $180K to $430KAgency spend history
NSW Reconstruction AuthorityContract size
What NSW Reconstruction Authority has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






