Tender: Seqwater Preferred Supplier Panel – Sustaining Capital Works for Water Infrastructure (3‑year panel with extensions)
Released about 1 year ago
About
Seqwater is seeking suitably qualified contractors to form a Preferred Supplier Panel to deliver sustaining capital works that maintain, renew and upgrade existing assets. The panel will be engaged for an initial three (3) year period with options to extend by two (2) years and a further two (2) years, covering civils infrastructure (dams, weirs, roads), network assets (piping, valves, flowmeters) and energy/electrical systems (High Voltage switchboards, variable speed drives). This EOI sets out Seqwater’s requirements, including specifications, supply timing and other considerations, and shortlisted respondents will be invited to tender through a subsequent Request for Offer; EOIs close 12 December 2025 at 12:00 PM (Brisbane time).
Similar open tenders12
Agency spend history
SeqwaterContract size
What Seqwater has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






