Tender: Study, Design and Development Services for Mulga Downs Iron Ore Project
Released 12 months ago
Closes03 Dec 2027
Likely valueEstimate$130K to $480KInflation adjusted
LocationNot specified
AgencyHANROY IRON ORE PROJECTS PTY LTD
SourceICN Gateway
CategoryMining & Natural Resources
383 days leftCloses Fri, 3 Dec 2027
About
HanRoy, as part of Hancock Prospecting, is seeking suppliers to support the study, design and development of the proposed Mulga Downs iron ore mine and associated infrastructure (the Project). The brief focuses on early-stage technical and design work to advance the proposed iron ore mine and its supporting infrastructure under HanRoy/Hancock Prospecting leadership.
1 potential contact foundLocked
Auto-detected from the tender listing & documents. Verify before relying on them.
Similar open tenders12
TenderCloses
Study for Development Requirements of Ministers North Brockman Ore Deposit (13 km SE of Yandi)Mining & Natural Resources
30 Jun 2028
Western Ridge Greenfield Development Study – Adjacent to Mt Whaleback, West of NewmanMining & Natural Resources
31 Dec 2026
Development of Hope Downs 2 and Bedded Hill Top Deposits — Hope Downs 1 Hub, East PilbaraMining & Natural Resources
31 Dec 2026
Rio Tinto Brockman Syncline 1 (BS1) Greenfield Satellite Mine Development – West PilbaraMining & Natural Resources
11 Dec 2026
Similar awarded contracts12
Likely value $130K to $480KContract and supplierAwarded value
Consultancy Services for Port and Infrastructure Study for Pilbara Iron Ore ExportsConsultancy & LegalWorley Parsons Services Pty Ltd
$90,970
Consultancy Services for Joint WA-China Iron Ore Processing StudyMining & Natural ResourcesEvans and Peck
$106,480
Conceptual Cover and Landform Design and Survey of Construction Material for Former Rum Jungle Mine SiteMining & Natural ResourcesO'Kane Consultants Pty Ltd
$327,338
Study of Infrastructure Options for Northwest Victoria Mineral Sands Region by GHD Pty LtdMining & Natural ResourcesGHD Pty Ltd
$239,605
Agency spend history
HANROY IRON ORE PROJECTS PTY LTDYearlyQuarterly
0
Contract size
Under $100K
$100K to $1M
$1M to $10M
$10M to $100M
$100M and over
What HANROY IRON ORE PROJECTS PTY LTD has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open mining and natural resources tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






