Tender: Study for Development Requirements of Ministers North Brockman Ore Deposit (13 km SE of Yandi)
Released about 1 year ago
About
BHP is seeking a supplier to undertake a study to understand requirements around the development of Ministers North (MN), a high-grade Brockman ore deposit located approximately 13 km south-east of Yandi.
This could be ideal for mining consultants or engineering firms with experience in ore deposit development and technical studies. Potential challenges include the need for detailed expertise on developing high-grade Brockman ore deposits and preparing requirements specific to the Ministers North site near Yandi.
Tender breakdown
From 1 documentEOI details are general and may change — do not assume final specs or quantities
There is no guarantee BHP will proceed to contract with any respondent
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents1
Grouped by what each file is for
Similar open tenders12
Similar awarded contracts12
Likely value $120K to $330KAgency spend history
BHP IRON ORE PTY. LTD.Contract size
What BHP IRON ORE PTY. LTD. has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






