Construction of Cell 3 at Benalla Landfill by Winslow Constructors
Awarded 24 Feb 2021
About
Benalla Rural City Council awarded a contract to Winslow Constructors Pty Ltd for the construction of Cell 3 at the Benalla Landfill.
The works include bulk earthworks, subgrade and subbase preparation, bunds, supply and placement of aggregate leachate drainage layer, excavation of cell liner anchor trenches, and batter slope protection.
The contract also covers cell lining works such as supply and installation of Geosynthetic Clay Liner (GCL), High-Density Polyethylene (HDPE) liner, geotextile cushion layer, leachate underdrainage pipe, HDPE leachate sump with concrete base solar pump and pipe riser, and geotextile filter layer.