Awarded 01 May 2018
This is an awarded contract.
View Live TendersEnd of Project Review for Irrigation Infrastructure and Fisheries Production in the Lower Mekong and Murray-Darling Basins
About
Australian Centre for International Agricultural Research awarded a contract to Jim Barrett Consulting for an end-of-project review of irrigation infrastructure design aimed at increasing fisheries production in floodplain wetlands of the Lower Mekong and Murray-Darling Basins, including commentary on fishway projects in Lao PDR.
This review reflects ACIAR's focus on integrating agricultural and environmental outcomes in international development projects.
Similar Open Tenders
Engineering Consultancy for Wastewater Treatment Upgrades — Murray Downs, Moama & Barham (Murray River Council)
Closes: 22 Oct 2026
Water & Sanitation
Water Infrastructure Upgrades and Regulator Construction – Riverland (Berri Basin, Overland Corner, Gerard)
Closes: 12 Oct 2026
Water & Sanitation
Barlil Weir and Cooranga Weir Approvals – Queensland Regional Water Security and Agricultural Support
Closes: 31 Dec 2028
Water & Sanitation
Optimising Irrigated Grain Crop Agronomy to Maximise Profit per Megalitre of Water
Closes: 03 Nov 2026
Agriculture & Farming
Murray River Council Transport and Bridge Asset Condition Assessments and Valuation
Closes: 23 Oct 2026
Infrastructure
Merri River Flow Study – Glenelg Hopkins Catchment Management Authority
Closes: 30 Oct 2026
Water & Sanitation
30-Year Infrastructure Master Plan for Riverina Water (1 Jul 2027–30 Jun 2057)
Closes: 22 Oct 2026
Water & Sanitation
Australian Government Purchase of NSW Border Rivers Surface Water Rights (approx. 3.68 GL/y)
Closes: 11 Mar 2027
Energy & Environment
Construction and Establishment of Bio-retention Basin – Heit Family Park, Willowbank (EOI)
Closes: 21 Oct 2026
Water & Sanitation
Water Infrastructure Upgrades at Loveday and Mussel Lagoon Wetlands — Regulator Replacements & Causeway Retrofit
Closes: 12 Oct 2026
Water & Sanitation
Condition Assessment and Revaluation of Bridges and Major Culverts – Rural City of Wangaratta (FY27)
Closes: 09 Oct 2026
Infrastructure
Mildura Urban Growth Mains — Lower Murray Water
Closes: 23 Oct 2026
Water & Sanitation
Other Similar Contracts
Value: $1,241,110.2
Conducted ACIAR Research Project on Irrigation Infrastructure for Fisheries in Mekong and Murray-Darling Basins
Supplier: Department of Primary Industries
Research & Development
Value: $150,000
Pilot Study for Fish-Friendly Irrigation and Mini Hydro Design in Mekong and Murray-Darling Basins
Supplier: Department of Primary Industries
Agriculture & Farming
Value: $13,552
Final Review of ACIAR Fish Passage Technology Project in Laos
Supplier: Martin Mallen-Cooper
Research & Development
Value: $2,021,595
Development of Fish Passage Technology for Floodplain Fisheries in Mekong and Murray-Darling Basins
Supplier: Department of Employment, Economic Development and Innovation
Research & Development
Value: $10,350
End of Project Review of Rice-Shrimp Farming Systems in Mekong Delta by ACIAR
Supplier: Mr Barney Smith
Agriculture & Farming
Value: $250,000
Research Project on Water for Fish and Irrigation in the Mekong
Supplier: Australia Mekong Partnership for Environmental Resources and Energy Systems
Research & Development
Value: $15,950
End of Project Review for Profitable Crop-Livestock Systems in Cambodia and Lao PDR
Supplier: Dr Brian Lund
Agriculture & Farming
Value: $23,573
Conducted mid-term review of FIS/2023/133 — Optimising fish passage at hydropower sites in the Mekong (Reviewer 1)
Supplier: University of Technology Sydney
Energy & Environment
Value: $11,850
Mid-Term Review of ACIAR Land Resource Evaluation Project in Myanmar
Supplier: David G. Rossiter
Research & Development
Value: $470,552.51
Development and Delivery of an Integrated Monitoring and Evaluation Project for the Murray-Darling Basin
Supplier: Alluvium Consulting Australia Pty Ltd
Research & Development
Value: $330,000
Economic Survey of Irrigation Farms in the Murray-Darling Basin for 2012-13
Supplier: Australian Bureau of Agricultural and Resource Economics and Sciences
Agriculture & Farming
Value: $14,000
Project Review by The WorldFish Center for Australian Centre for International Agricultural Research
Supplier: The WorldFish Center
Research & Development
Suppliers similar to Jim Barrett Consulting
MR GEOFF MORRIS
2 contracts
Research & Development
Richard Markham
6 contracts
Research & Development
THEO SIMOS & ASSOCIATES
4 contracts
Consultancy & Legal
DR BRIAN KEATING
4 contracts
Consultancy & Legal
Dr Russell Haines
5 contracts
Agriculture & Farming
DR DOUGLAS GRAY
6 contracts
Research & Development
Dr. Robert Bernard Edis
2 contracts
Research & Development
Dr Ian Willett
8 contracts
Research & Development
Live Feed
Tenders and contracts,
consolidated and enriched.
We pull tenders and awarded contracts from government portals around the clock. Each one is categorised, enriched, and searchable shortly after it's published.
Smart Recommendations
Matched to your business,
automatically.
Our AI reads every new tender and contract, and recommends the ones relevant to your business in real time. No searching required.
Your Dashboard
Configure once,
run on autopilot.
Set up your alerts, watchlists, and preferences from your dashboard. GovMarket works in the background so you can focus on winning work.
GovMarket AI
Search tenders and contracts
in plain English.
Find tenders, look up suppliers, check who won contracts, and explore agency spend. Just type what you need.
Get Started
Win more government work.
Join suppliers across Australia using GovMarket to find and win contracts.
7 days free, then $49.99/AUD per month







