Remediation Works for Warwick Station Footbridge awarded to Finlay Group Construction Pty Ltd
Awarded 03 Feb 2025
About
Public Transport Authority awarded a contract to Finlay Group Construction Pty Ltd for remediation works on the Warwick Station footbridge.
The cable-stayed footbridge spanned the southbound Mitchell Freeway and connected the bus exchange, Warwick rail station and passenger carpark; it comprised a continuous two-span steel girder deck with a main span of 32.5 metres, a secondary span of 16.25 metres (48.75 metres total) and a central pier rising to approximately 16 metres.
The remediation scope addressed improperly installed steel beam bearings on the western support identified by BG&E in 2022 and confirmed by Jacobs in 2023, and comprised replacement of the heavily cracked precast concrete support beam, replacement of the bearings supporting the footbridge, and minor concrete repairs to adjacent beams, delivered in accordance with a remediation work plan and a high-level construction staging plan developed by the design consultant.
Similar open tenders12
Suppliers similar to Finlay Group Construction Pty Ltd8
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.