Replacement of Concrete Footpath on Bridge 912 over Canning River by Main Roads WA
Main Roads Western Australia · Awarded contract
AwardedReplacement of Concrete Footpath on Bridge 912 over Canning River by Main Roads WA
Awarded 18 Apr 2012
Awarded18 Apr 2012
Value$118,147.00
SupplierJomar Contracting (MAINFORM CORPORATION PTY LTD)ABN 41 635 853 217
StateWA
CategoryInfrastructure
About
Main Roads Western Australia awarded a contract to Jomar Contracting (MAINFORM CORPORATION PTY LTD) for the replacement of concrete and timber decking footpath with Bondek and concrete footpath on Bridge 912, Canning Highway over Canning River (SLK 5.92).
Similar open tenders12
TenderCloses
Replacement of Congdon Street Bridge over Rail at Swanbourne Train Station – Main Roads Western AustraliaInfrastructure
11 Dec 2026
Schumann Road Bridge Replacement with Reinforced Concrete Box Culvert – Djarawong (Cassowary Coast)Infrastructure
04 Dec 2026
Design and Construction of Rail Bridge Walkway Improvements — Fremantle and Canning (Stokely)Infrastructure
15 Dec 2026
Back Creek and Tanduringie Creek Bridge Upgrades – New England Hwy (Yarraman–Toowoomba) & Kingaroy–Cooyar RdInfrastructure
20 Jan 2027
Intersection Improvement Works – Karrinyup Morley Highway, Wellington Road & Camboon RoadInfrastructure
04 Dec 2026
West Moreton Bridge Renewal Stage 2 — Replacement of Four Timber Rail Bridges on Rosewood–Toowoomba LineInfrastructure
11 Jan 2027
Concreting Crew for Mount Coolon Floodway and Gargett‑Mia Mia Culvert Wingwall – RoadTek MackayInfrastructure
11 Dec 2026
Construction of New Bunberoo Creek Two-Span Bridge and Approach Roads – Carrs, Capitts & Bunberoo Creeks Project (Locks 8–9)Infrastructure
01 Dec 2026
Replacement of Bight Bridge over the Manning River, Wingham NSW – MidCoast CouncilInfrastructure
22 Jan 2027
Helen Street Footbridge Replacement – Design, Fabrication & Construction (Byron Shire Council)Infrastructure
22 Dec 2026
Port Willunga North Coast Park Shared Path, Bridge and Boardwalk WorksInfrastructure
30 Nov 2026
Alchera Drive Footpath, Kerb and Underground Stormwater Drainage Upgrade – Mossman (Captain Cook Highway)Infrastructure
18 Dec 2026
Suppliers similar to Jomar Contracting (MAINFORM CORPORATION PTY LTD)8
SupplierContracts
Jonor Construction Pty. Ltd.Infrastructure
48
Fortec Australia Pty LtdInfrastructure
32
Regional BridgingInfrastructure
22
Neo InfrastructureInfrastructure
11
Structural Systems (Western) Pty LtdInfrastructure
14
ROADSWEST ENGINEERING GROUP WA PTY LTD (Roadwest Engineerig Group Pty Ltd)Infrastructure
17
Marine & CivilInfrastructure
3
Advanteering Civil EngineersInfrastructure
63
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month
Revenue from government work$312K won so far






