Replacement of Loading Dock Handrails and Gates at TI Hospital
Awarded 27 Feb 2026
About
Torres and Cape HHS awarded a contract to Northern Construction Company Pty Ltd for the replacement of loading dock handrails and gates at TI Hospital.
The scope included organising disruption notices, setting up exclusion zones, removing rusted handrails from the loading dock to the bottom of the front entry stairs, and supplying and installing custom-made hot-dipped galvanised handrails with double gates and stainless-steel balustrade wire to match the existing style.
The gate opening was made smaller to reduce fall risk, and missing stainless-steel balustrade wire on the back entry stairs was replaced.
All trade-related rubbish was removed, and the site was left tidy.
The contract value was $20,218, procured through a selective method under the Building Trade, Repairs, Maint.
category.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.






