Supplier · Infrastructure, IT & Software, Construction

ISAS - Integrated Switchgear and Systems Pty Ltd

Won in the last 12 months$1.1M▲ 2488% on the year beforeValue won per quarter, last three years
Contracts on record34$8.7M in total
Running now0Latest win May 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerDepartment of Infrastructure, Planning and Logistics45% of their value
31contractssince 2007
$8.5Mwon in totallatest May 2026
$77Ktypical contractmost $44K to $139K
$1.1Mlast 12 monthsup from $44K
0active now
Biggest buyerDepartment of Infrastructure, Planning and Logistics13 contracts · $3.9M · 46% of value

What they do

ISAS - Integrated Switchgear and Systems Pty Ltd supplies switchgear, protection panels, SCADA and building management systems, plus controls and instrumentation for water and sewerage infrastructure.

Who buys from them

Its largest buyers are Department of Infrastructure, Planning and Logistics with 13 contracts, Power and Water Corporation with 4, Department of Infrastructure with 5, Department of Corporate and Information Services with 5 and Department of Defence with 2. It has 7 buyers.

Contract size

Contracts typically fall between $44K and $139K, with a median of $77K. Its largest are high voltage and SCADA maintenance at Royal Darwin and Palmerston Regional Hospitals for $2.7M, a controls and instrumentation panel for water and sewerage infrastructure for $2.3M and protection panels for $573K.

Recent activity

In the last 12 months there were 2 contracts worth $1.1M, including supply of protection panels to Power and Water Corporation. The latest award was May 2026.

Built from awarded contracts on record

What they win

How much they win each year, the size of a typical contract, and every contract on record.

Who they win it from

Their biggest government buyers and how much of their work each one is.

Department of Infrastructure, Planning and Logistics is their biggest buyer at 45% of value, across 5 buyers shown.

About them

Company details, where they work and the names they trade under.

Also traded asIntegrated Switchgear & Systems Pty Ltd, INTERGRATED SWITCHGEAR & SYSTEMS, ISAS - INTEGRATED SWITCHGEAR &, ISAS - Integrated Switchgear and Systems Pty Ltd, ISAS – Integrated Switchgear and Systems Pty Ltd, ISAS - INTEGRATED SWITCHGEAR AND SYSTEMS PTY LTD, ISAS Integrated Switchgear & Systems Pty Ltd

Similar suppliers

Open tenders that match their work

Main Switchboard Replacement – Museum and Art Gallery of the Northern Territory, DarwinCloses 9 DecConstructionColonel Light Centre Electrical Infrastructure Renewal – Main Switchboard, Distribution Boards & Generator InstallationCloses 20 NovInfrastructureRefurbishment and System Upgrades at HMAS Kuttabul & HMAS Waterhen, NSWCloses 23 NovConstructionDarwin – Provision and Implementation of Emergency Operations and Business Continuity Incident Management SystemCloses 11 DecIT & SoftwareAlice Springs Hospital – Plumbing and Hydraulic Maintenance & Minor Works (36-Month Contract)Closes 1 DecConstructionRefurbishment of North West Vernon Island Navigation Aid Structure near DarwinCloses 15 DecTransport & LogisticsSupport Facilities and Infrastructure Upgrades at HMAS Stirling, Western AustraliaCloses 31 DecDefense & AerospaceReplacement of End-of-Life Stormwater Pumps and System Upgrade at MSAC – Supply and Install Two New PumpsCloses 9 DecWater & SanitationManaging Contractor for Alternate Energy Solution at Deep Space Advanced Radar Capability, Naval Communication Station Harold E. Holt (Exmouth)Closes 17 DecEnergy & EnvironmentMechanical Preventative Maintenance for Christmas Island Hospital and District High SchoolCloses 17 NovConstructionRepairs and Maintenance of Fire Detection Systems in NT Government Assets — Darwin & East Arnhem (36-month contract)Closes 3 DecPublic Safety & SecuritySupply and Installation of Chiller Plant, Cooling Tower and Main Switchboard Upgrade – Caloundra Indoor StadiumCloses 17 NovConstruction

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/AUD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.